Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    April 17, 2013
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required
  • Zoomlion finds buyers for both cranes brought to INTERMAT
    January 6, 2017
    Zoomlion is celebrating a successful visit to INTERMAT after selling both the tower crane and the crawler crane that it brought to the show. The T320-16 tower crane has been sold to Germany rental company Streif Baulogistik, which operates a fleet of hundreds of cranes in Germany and Poland. The T320-16 combines Chinese and European know-how, as it features technology from Jost. Dutch end-user Crane House has brought the Zoomlion QUY 80 crawler crane. Zoomlion chief operating officer Delfino Corti said that
  • Zoomlion finds buyers for both cranes brought to INTERMAT
    April 19, 2012
    Zoomlion is celebrating a successful visit to INTERMAT after selling both the tower crane and the crawler crane that it brought to the show. The T320-16 tower crane has been sold to Germany rental company Streif Baulogistik, which operates a fleet of hundreds of cranes in Germany and Poland. The T320-16 combines Chinese and European know-how, as it features technology from Jost. Dutch end-user Crane House has brought the Zoomlion QUY 80 crawler crane. Zoomlion chief operating officer Delfino Corti said that
  • Two new rough terrain cranes and a new MLC165 lattice-boom crawler crane from Manitowoc
    January 6, 2017
    Manitowoc will unwrap two new Grove rough-terrain cranes at Bauma: the RT550E and RT770E, as well as a new lattice-boom crawler crane. The 45tonne capacity RT550E offers the highest and longest boom in its class at 39m and, with a chassis length of just under 12m, a width of 2.55m and an operating weight of 29tonnes, the new machine is a compact crane that can run well within most national European road regulations for heavy machinery says Manitowoc. The RT550E also features the manufacturer’s new crane con