Skip to main content

Costs revised for Denmark’s proposed Kattegat Bridge

A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
May 9, 2016 Read time: 3 mins
A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report.

The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll.

A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the ministry to shelve the planning process for the bridge which would have been open by 2030.

The Kattegat is a shallow 30,000km2 sea between Denmark and Sweden’s southwest coast. It can be very difficult and dangerous to navigate because of many reefs and shifting currents. Nonetheless, the Kattegat is an important commercial navigation passage as well as a popular summer vacation area.

The proposed Kattegat Bridge – in effect, two sections – would cover 35km to link Jutland and Zealand and possibly have a rail line.

The ministry’s report expected average traffic growth would be 1.25% annually between 2020 and 2030, with loan rates or around 3%.

However, Rambøll’s assessment is based on traffic increases of around 2.2% annually and loan interest rates or 2%.

A new bridge would take some of the traffic from the nearby and often heavily congested Great Belt Fixed Link between the Danish islands of Zealand and Funen. The Great Belt consists of three structures: a road suspension bridge and a railway tunnel between Zealand and the small island Sprogø located in the middle of the Great Belt, and a box girder bridge for both road and rail traffic between Sprogø and Funen.

An earlier report by 6801 Ramboll, in July 2007, found that 60% of peope in a poll favoured construction of a bridge over the Kattegat, up from 47% earlier that year. Ramboll also commented at the time that people were “much more positive about a Kattegat project than the proposed Fehmarn Bridge”, according to a report by the Copenhagen Post newspaper.

The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. A 17km tunnel, including two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Both governments are putting the project together.

The Danish political parties behind the Fehmarnbelt link have mandated 4782 Femern A/S to appoint preferred bidders for the main tunnel work in order to enter into conditional contracts no later than mid-May.

Femern A/S is the Danish government-owned company managing the Fehmarn Belt immersed tunnel project between Denmark and Germany. It is supposed to be built, owned - apart from the German land works - and operated by Femern A/S, a subsidiary of Sund & Bælt Holding, and financed by loans guaranteed by the Danish government.

For more information on companies in this article

Related Content

  • More financial doubt over proposed Fehmarn Belt Tunnel
    March 17, 2017
    The proposed Fehmarn Belt Tunnel to link Denmark and northern Germany will never be economically viable, according a report commissioned by German ferry operator Scandilines. Revenue and traffic forecasts are unrealistically high, notes the report completed by German consultancy DIW Econ. It is unlikely that the latest cost to build the massive road tunnel, around €7.4 billion, would ever be recovered. The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Cur
  • Challenges mount for the Fehmarn Belt Fixed Link project
    December 15, 2016
    The Fehmarn Belt Fixed Link between Danish and German islands faces ongoing delays that are pushing a construction start past this year and well into 2018. A meeting in mid-December between Danish traffic minister Ole Birk Olesen and his German counterpart Reinhard Meyer for the neighbouring German state of Schleswig-Holstein, highlighted mounting opposition against the €7 billion or more project. During the meeting, Meyer stressed that the Schleswig-Holstein government remains determined to implement
  • German court decides for Fehmarnbelt
    November 18, 2020
    Danish state-owned company Femern is responsible for the 18km road-rail tunnel.
  • Fehmarnbelt Tunnel start looms on the horizon - 2020
    October 20, 2017
    Work on the €7 billion immersed tunnel under the Fehmarnbelt could begin in 2020, according to the Danish state planning and operating company Femern. A construction start has been delayed on the 18km tunnel that will run between Germany and Denmark because of environmental and consultation issues in Germany. But Claus Baunkjaer, chief executive of Femern, said he is confident that Germany will give approval next year with another two years of preparations. Baunkjaer noted that Denmark is all set to p