Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Money lacking for Széchenyi Bridge renovation
    February 10, 2020
    Money problems for renovation of Budapest's Chain Bridge
  • VST used on Portuguese bridge
    February 17, 2012
    PERI says that its new VST heavy-duty shoring tower serves as load-bearing scaffold for the large bridge and civil engineering projects. Each leg on the VST (VARIOKIT Shoring Tower) system can carry a load of around 600kN (the weight of about 60 VW Golf cars or one Leopard-2 tank), and the extremely flexible modular system can be assembled as segmental sections, towers or shoring tower frames for heights up to 40m.
  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.