Skip to main content

Colombia’s tunnel of woe faces further setback

The troubled tunnel construction project in Colombia to build the La Linea link has faced yet a further setback in its long tale of woe. The tender for the completion of the final 12% of the tunnel project has not managed to attract any interest from contractors. The budget for this work is an estimated US$77 million. A new tender process is being launched, with a submission deadline of 6th June 2017 and planned winner announcement on 4th July 2017. The contractor that had been building the tunnel failed to
May 19, 2017 Read time: 2 mins
The troubled tunnel construction project in Colombia to build the La Linea link has faced yet a further setback in its long tale of woe. The tender for the completion of the final 12% of the tunnel project has not managed to attract any interest from contractors. The budget for this work is an estimated US$77 million. A new tender process is being launched, with a submission deadline of 6th June 2017 and planned winner announcement on 4th July 2017. The contractor that had been building the tunnel failed to meet the necessary completion deadline and was involved in a dispute with Colombia's National Road Institute (2812 Invias), resulting in the firm losing the contract. However the project has been delayed previously on many occasions and for many reasons, including having the wrong kind of insurance cover for the work and due to more challenging than anticipated geological conditions. Construction commenced in 2004 with the breakthrough occurring in 2008, while the tunnel was originally planned for completion in mid-2016 but will not be ready for use until 2018.


When the tunnel is complete it will connect Calarcá, Quindío and Cajamarca and provide a much safer and faster transport link than the present route over a mountain pass. Travel speeds are low along the existing route, which features several sharp curves and has an unenviable record for crashes. The 8.6km tunnel will provide a new connection for the National Route 40 highway joining Bogotá with Cali as well as the port of Buenaventura. The tunnel runs underneath the Cordillera Central range, with its western portal at an altitude of 2,420m and the eastern at 2,505m.

For more information on companies in this article

Related Content

  • La Linea Tunnel project recommences
    April 17, 2020
    Construction work on Colombia’s La Linea Tunnel project has recommenced.
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Colombia sets out major strategy for highway investment
    January 19, 2015
    International interest is strong in Colombia’s infrastructure expansion. Five foreign firms are competing in the country’s 4G road tender process. Fomento de Construcciones y Contratas (FCC), Sinohydro, Sacyr, Tradeco and ICA are amongst the companies competing for 10 contracts worth some US$5.88 billion. The first project opening for tender on 19th May 2015 will be for the Puerta de Hierro-Carreto-Palmar de Varela and Carreto-Cruz del Viso routes. The final tender documents for the 10 projects are being pu
  • Colombian highway connections under construction
    April 9, 2014
    In Colombia work on the dual carriageway connecting Bogota and Buenaventura is now 40% complete. The link should be complete by the end of 2016. The Bogota-Girardot road is now opening, with excavation work still underway on the La Linea tunnel. The tunnel section of the project has been subject to delays arising from geological issues but when it is open, the tunnel will cut travel times and also improve safety over the existing route. The driving of the tunnel should be complete by September 2014 with the