Skip to main content

Colombia’s Tunel de Oriente delay

The construction of Colombia’s Tunel de Oriente project is running behind schedule. Unexpected geological problems are the reason for the delay to the project’s completion. However the builders have assured the client that the delay will not increase the cost of the project. The tunnel, located in Colombia’s Antioquia Department, was due for completion in December 2018 but will now be ready by May 2019.
August 20, 2018 Read time: 1 min

The construction of Colombia’s Tunel de Oriente project is running behind schedule. Unexpected geological problems are the reason for the delay to the project’s completion. However the builders have assured the client that the delay will not increase the cost of the project. The tunnel, located in Colombia’s Antioquia Department, was due for completion in December 2018 but will now be ready by May 2019.

Related Content

  • Colombia dual carriageway concession awarded
    January 29, 2021
    A key Colombian dual carriageway concession has been awarded.
  • Colombia’s La Linea Tunnel link opening
    September 1, 2020
    Colombia’s La Linea Tunnel link is opening to traffic.
  • Colombia: Toyo Tunnel award to be made in September
    July 15, 2015
    The contract award for Columbia’s 9.75km Toyo Tunnel project will be made on September 28, according to Columbian media. The tunnel, costing almost US$760, will be part of a new 39km road between Santa Fe de Antioquia and Canasgordas. World Highways reported in January that the central government will contribute $216 million towards the project, the regional government of Antioquia department will contribute $337 million and the Medellin city government will pitch in with $212 million. Columbia’s N
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.