Skip to main content

Colombia: Estructura Plural SAC 4G is awarded motorway concession

Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia. The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels. The existing road will be improved and a second lane added between Medellin and Santa Fe. Meanwhile, Colombian construction firm Construcciones El Condor and the national infrastructure agency ANI have signed a pu
July 2, 2015 Read time: 1 min
Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia.

The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels.

The existing road will be improved and a second lane added between Medellin and Santa Fe.

Meanwhile, Colombian construction firm Construcciones 4882 El Condor and the national infrastructure agency ANI have signed a public-private partnership contract to improve 350km of road section between 2921 Cesar and La Guajira.

The project will cost nearly $135.5 million.

For more information on companies in this article

Related Content

  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports
  • Colombian highway tenders now underway
    February 10, 2015
    In Colombia the tender process is underway for two major highway projects worth a total of US$1.257 billion. The Autopista Mar 1 and Autopista Mar 2 projects are located in the department of Antioquia and the details of the projects were published by Colombia’s national infrastructure agency ANI, reports Business News Americas. These projects number amongst the 10 concessions the Colombian Government is awarding for the second round of its $25 billion 4G national highway plan.
  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
  • FCC heads group that will build Toyo Tunnel in Colombia
    November 6, 2015
    Spanish environmental services, infrastructure and water group FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia. The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%. The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and constru