Skip to main content

Chile’s bridge budget announced

Chile’s Ministry of Public Works (MOP) has revealed an ambitious plan for bridge projects. The MOP has set a budget of US$1.48 billion to be used for a range of bridge projects for the 2018-2023 time period. In all 229 bridges are included in the programme of works, with structures due for maintenance and upgrade work.
July 12, 2018 Read time: 1 min

Chile’s Ministry of Public Works (MOP) has revealed an ambitious plan for bridge projects. The MOP has set a budget of US$1.48 billion to be used for a range of bridge projects for the 2018-2023 time period. In all 229 bridges are included in the programme of works, with structures due for maintenance and upgrade work.

Related Content

  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • Chile’s Chacao Bridge under construction
    March 6, 2018
    Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlie