Skip to main content

Chile struggles to meet US$1.5 billion goal for tendering in 2106

The Chilean government reached its goal of tendering infrastructure projects worth US$1.1 billion in 2015, its first year in power, but will likely miss its 2016 target of $1.5 billion by next month. This has been unofficially confirmed by the Ministry of Public Works, which has stated that it will not be possible to announce new tenders over the coming weeks. The projects with delays include the new Rancagua-Alhue and Santiago-Marga Marga-Quillota roads, as well as the creation of a dual carriageway on the
February 19, 2016 Read time: 2 mins
The Chilean government reached its goal of tendering infrastructure projects worth US$1.1 billion in 2015, its first year in power, but will likely miss its 2016 target of $1.5 billion by next month.

This has been unofficially confirmed by the Ministry of Public Works, which has stated that it will not be possible to announce new tenders over the coming weeks.

The projects with delays include the new Rancagua-Alhue and Santiago-Marga Marga-Quillota roads, as well as the creation of a dual carriageway on the Ruta 5 road between Antofagasta and Iquique.

However, concessions coordinator Eduardo Abedrapo said he is confident that the objective will be met. He said that projects to be put to tender in March include the $500 million Punilla reservoir, the El Melon Tunnel worth around $128 million and the Carriel Sur airport and Nogales-Puchuncavi road, which together total $872 million.

But that leaves the government $628 million short of its $1.5 billion goal.

Related Content

  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Key Chilean connections
    November 27, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million. Bidding is expected to close in early 2014 and the winner will be selected and the contract awarded. Work should start in 2015 and the completion date will be in 2019. A
  • Equipment firm Wacker Neuson posts bullish results
    March 31, 2014
    Munich-based equipment manufacturer Wacker Neuson reports an increase in Group revenue and profitability in 2013. This has been achieved in spite of tough trading conditions and having met its targets for 2013, the firm aims to remain on track in 2014. The company achieved €1.16 billion in revenue and says it managed to boost market penetration of light and compact equipment in its core European and US markets. It also developed specific new markets. Group revenue rose 6% to €1.16 billion, compared with nea
  • ANI transfers operation of Guillermo Gaviria Correa to Mar 1 Devimar
    July 6, 2016
    The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI). ANI will, in turn, cede the concession to the Mar 1 Devimar consortium. The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for