Skip to main content

ANI transfers operation of Guillermo Gaviria Correa to Mar 1 Devimar

The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI). ANI will, in turn, cede the concession to the Mar 1 Devimar consortium. The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for
July 6, 2016 Read time: 2 mins
The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI).

ANI will, in turn, cede the concession to the Mar 1 Devimar consortium.

The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for a year before being among 10 people killed in 2003 in response to an attempted military rescue.

In operation since 2007, the highway, in combination with the Fernando Gómez Martínez tunnel – the longest tunnel in South America - has done away with the curvy roads once commonplace in the tourist areas of Santa Fé de Antioquia, San Jerónimo and Sopetrán.

The Mar 1 Devimar consortium will soon start construction of the Mar 1 motorway, one of the main projects included in the federal government's 4G Roads Programme. The contract for construction of the 176km Mar 1 was awarded in 2015. The road will connect with the El Toyo tunnel and Mar 2 motorway at a cost of around US$500 million. Work will include construction of 17 tunnels and 41 bridges, as well as a second lane in the Medellin-Santa Fe section and refurbishment of Bolombolo-Santa Fe section.

Meanwhile, the president of the National Infrastructure Agency (ANI), Luis Fernando Andrade, said that there is a six-month delay in achieving financial closures for the first phase of the government's 4G Road Programme. There are, however, 12 projects in the first stage of the process, which involves letters of commitment delivered to ANI by the investors.

Andrade said that financial closures for the remaining projects are likely to be ready in the near future, apart from the Mulalo-Loboguerrero motorway in Valle del Cauca department.

Related Content

  • Evonik’s top marks for Colombian tourist highway solution
    May 15, 2014
    Leading German road marking product manufacturer Evonik Industries has played a key role in improving safety on a popular Colombian tourist highway, as Guy Woodford reports Bearing the name of the memorable peacemaker governor of Antioquia, the Guillermo Gaviria Correa road, located between the Colombian municipalities of Medellin and San Jerónimo, connects Medellin to the Uraba Gulf part of the Caribbean Sea. In operation since 2007, the road, in combination with the Fernando Gómez Martínez tunnel –
  • Colombia: Toyo Tunnel award to be made in September
    July 15, 2015
    The contract award for Columbia’s 9.75km Toyo Tunnel project will be made on September 28, according to Columbian media. The tunnel, costing almost US$760, will be part of a new 39km road between Santa Fe de Antioquia and Canasgordas. World Highways reported in January that the central government will contribute $216 million towards the project, the regional government of Antioquia department will contribute $337 million and the Medellin city government will pitch in with $212 million. Columbia’s N
  • Colombia: Estructura Plural SAC 4G is awarded motorway concession
    July 2, 2015
    Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia. The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels. The existing road will be improved and a second lane added between Medellin and Santa Fe. Meanwhile, Colombian construction firm Construcciones El Condor and the national infrastructure agency ANI have signed a pu
  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.