Skip to main content

Canada: Ring of Fire road debate heats up

A 400km road built specifically into the Canada’s isolated but mineral-rich Ring of Fire region could cost between US$204-$443 million, according to a government-funded study. The road, entirely in the province of Ontario, would start in the port of Thunder Bay at the head of the Great Lakes and run northeast to the James Bay area, just south of Hudson Bay.
September 6, 2016 Read time: 3 mins

A 400km road built specifically into the Canada’s isolated but mineral-rich Ring of Fire region could cost between US$204-$443 million, according to a government-funded study.

The road, entirely in the province of Ontario, would start in the port of Thunder Bay at the head of the Great Lakes and run northeast to the James Bay area, just south of Hudson Bay.

The region is named Ring of Fire after a proposed chromite mining and smelting development project. But a Ring of Fire development would likely impact the settlements of nine First Nations groups, as the indigenous people of Canada are called.

The Toronto newspaper Globe and Mail reported that it had obtained a copy of the 147-pagereport ahead of publication. The $600,000 All-Season Community Road Study looks at infrastructure development options, including rail lines as well as paved and unpaved roads, for the region should mining go ahead.

Access into and develop of remote area are often contentious issues in Canadian politics because of environment and cultural concerns. The Globe reported that the study involved discussions with four small, remote communities: Webequie First Nation, Eabametoong First Nation, Neskantaga First Nation and Nibinamik First Nation. Technical work was conducted by the Canadian engineering and construction firm SNC-Lavalin.

Some of the communities have no roads. Air travel, often float planes landing on lakes, would be the only access to the outside world. Roads would make it easier, especially for parents wishing to visit children who must move away to attend high school. Roads would reduce the cost of food and other goods from the south and also hook up similarly isolated communities.

However, some groups fear that more drugs and alcohol would reach the communities, the Globe reported.

International Railway Journal recently reported that Canadian mining company KWG Resources contracted China Railway First Survey and Design Institute Group to carry out a feasibility study for a multi-user railway linking mines in the Ring of Fire region. The line would connect with Canadian National Railway’s main cross-Canada east-west line that passes through the city of Winnipeg in the province of Manitoba, to the west of Ontario, and the Ontario city of Sudbury.

The 328km line will carry chromite from the Big Daddy and Black Horse deposits, which KWG subsidiary Canada Chrome Corporation has secured rights to exploit, IRJ reported.

Related Content

  • Volvo CE machines assisting in extraction operation in Madagascar
    October 4, 2018
    A fleet of six Volvo EC480D excavators are the key machines for an extraction operation in Madagascar. The new site is producing thousands of tonnes of Chromite ore every day. Chromium is a relatively rare mineral, with South Africa claiming up to 70% of the earth’s reserves. But neighbouring island Madagascar also has significant deposits, and it was to this, the world’s fourth largest island, that Indian exploration firm APC sent its geologists to scout for suitable mining opportunities. They struck luck
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Parsons wins 407 Transitway contract around the Toronto area in Canada
    August 21, 2015
    Parsons has been selected by the Canadian province of Ontario to provide environmental assessment planning and preliminary design for the next section of the 407 Transitway. Work will include 23km of bus rapid transit lanes, from west of Hurontario Street to east of Highway 400, as well as 11 transit stations, all around the provincial capital Toronto area. The project is part of the 150km cross-regional rapid transit corridor planned to parallel Highway 407 Express Toll Route freeway, a 107km control
  • Testing time for Tlicho all-season gravel road in Canadian north
    January 27, 2020
    Contractors on the 97km Tlicho all-season gravel road in Canada’s far north are on site despite not having all proper approvals, according to Canadian media.