Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Prep starts on Lithuania’s A14 reconstruction
    November 4, 2021
    A short section of the Vilnius-Utena A14 - Lithuania's only concrete surface highway - was completed a few years ago.
  • Polish island tunnel connection planned
    February 7, 2017
    The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
  • Poland plans push-starting project
    February 28, 2012
    In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.