Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Slovakia to tap into the European Fund for Strategic Investment
    December 4, 2014
    The Slovak Finance Ministry has confirmed that it has earmarked two projects for which it will apply to the EU for funds from the newly created European Fund for Strategic Investment (EFSI). European Commission President Jean-Claude Juncker recently announced the creation of the US$26.2 billion EFSI fund as part of EC's $388 billion three-year investment plan to boost Europe's struggling economy. The two projects for which Slovakia plans to apply for funds from EFSI are the completion of the construct
  • BAM and Iridium get the green light Ross link road in Ireland
    December 15, 2014
    The BAM PPP PGGM and Iridium consortium has been named preferred bidder for the N25 New Ross Bypass project in the Irish Republic. The US$270 million (€217 million) contract - Design, Build, Finance, Maintain and Operate - involves 13.6 km of dual carriageway on the N25 and N30 routes and 1.2 km of the carriageway New Ross N30 route. Construction is expected to support around 300 jobs across Ireland and will be undertaken by a joint venture of BAM Civil and civil engineering firm Dragados. The road will
  • Discussions for Poland to Slovakia highway link
    January 23, 2018
    The Ministries of Transport for Poland and Slovakia have held discussions regarding the connection of the S1 and A1 highway links. The S1 road will run from the border with Slovakia to meet with the A1 highway at Pyrzowice in Poland. This road link should be ready for traffic in 2022. Also ready for traffic in 2022 should be Slovakia’s D3 highway.
  • Sao Paulo’s Mario Covas ring road faces last section glitch
    April 10, 2015
    A consortium of Brazil's Mendes Junior and Spain's Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo. The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.