Skip to main content

Sao Paulo’s Mario Covas ring road faces last section glitch

A consortium of Brazil's Mendes Junior and Spain's Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo. The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.
April 10, 2015 Read time: 3 mins
RSSA consortium of Brazil's Mendes Junior and Spain's 1392 Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo.

The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company 6344 Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.

If matters do not improve this month, "it is very likely that we will terminate our agreement based on a breach of contract," Dersa president Laurence Casagrande was quoted as saying.

The 180km Rodoanel Mário Covas beltway is partially with a radius of around 23km from the geographical centre of Sao Paulo. It was named after Mário Covas, mayor of the city between 1983–1985 and a state governor from 1994-2001 until his death from cancer. It is a controlled access highway with a speed limit of 100kph.

The northern segment is the last of the bletway’s four sections to be built. Construction of Dersa’s stretch of the northern section was originally scheduled to be completed last year but was rescheduled to January 2016. However, at the beginning of this year, Dersa pushed back the completion date to the first half of 2017.

If terminated, Dersa could transfer the work to local construction company Odebrecht, which submitted the next best offer for the contract. If not, a new tender for the remaining work could be launched, according to the news report.

Mendes Junior is one of many engineering companies under investigated by the federal government's so called car wash corruption probe.

The northern section connects the eastern and western sections of the Rodoanel Mario Covas beltway, passing through the cities of Aruja, Guarulhos and Sao Paulo. The project involves 44km of road, including 111 structures and seven tunnels.

The northern section tender was split into six lots, five of which have tunnels: the 6.4km lot 1 includes a 1.1km tunnel; the 4.9km lot 2 includes two tunnels of 350m and 850m length; the 3.6km lot 3 has two tunnels, 1.6km-lomg and 1km-long; the 9km lot 4 has a 290m-long tunnel. The 7.9km lot 5 has a 1.1km-long tunnel. The 12km lot 6, from Guarulhos and Aruja municipalities, does not include tunnels.

For more information on companies in this article

Related Content

  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge
  • Brazilian state of São Paulo announces bids for ring road
    May 28, 2012
    The Governor of São Paulo, Geraldo Alckim, has confirmed that the regional road development agency Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road. Of the bids, 17 are organised in consortia. Companies from Spain, Italy, France, Portugal, Mexico, Argentina and Korea are among those seeking the ring road tender. The reference price of the major infrastructure project is estimated at US$ 3.11billion, and the International
  • Investment for Brazil’s Sao Paulo ring road
    June 8, 2012
    A new loan has been approved that will help finance works on the northern stretch of the Sao Paulo ring road in Brazil. The US$1.15 billion loan is being provided by the Inter-American Development Bank (IADB). Approval for the IADB loan has come from Brazil’s Committee for Economic Affairs (CAE) at Brazil's Senate. The loan will finance construction of the Rodoanel Norte stretch of the ring road. This measures some 44km long and will connect with the west and east sections of the ring road as well as linkin
  • São Paulo calls US$1.6bn Tamoios highway PPP
    March 24, 2014
    Brazil's São Paulo state is due to call a tender by March 28 2014 to concession its Tamoios highway, a government official is reported to have told regional media. "Governor Geraldo Alckmin will be officially announcing the launch of the tender next week [Mar 24-28]," the official said last week without giving further details. Budgeted at US$1.61 billion (BRL 3.74 billion), the concession involves operating and maintaining the Planalto and Serra stretches of the Tamoios highway, also known as SP-99, which