Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • A decade for completing the 105km Cork-Limerick M20
    December 10, 2018
    It could be a decade before Ireland’s 105km Cork-Limerick M20 motorway is finished, the government has warned. Road safety groups and businesses have been pushing for the €900m M20 motorway because of issues over fatalities on the existing rural route. Simon Coveney, Ireland’s deputy prime minister, said the government was committed to the route – the largest motorway project to be undertaken in the next 25 years, and money has been earmarked for it. According to Irish media, Coveney also noted tha
  • Polish road tender underway
    February 3, 2015
    Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.
  • Tender process underway for Polish road projects
    August 18, 2014
    The tender process is underway for two major projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that bids have to be submitted by 10th October 2014. The A section will be some 4.6km long, the B section 6.45km long, whilst the C section will be
  • Poland's big transport plans
    July 6, 2012
    The European Investment Bank (EIB) looks likely to grant Poland a loan of €1.6 billion to carry out several key infrastructure projects. Some of the money will be used to finance the A2 highway from Lodz to Warsaw; Warsaw's southern ring road and a 50km section of the A4 highway to link with Germany.