Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Two Polish road projects moving aheaaad
    March 9, 2017
    Work on two sections of the S17 highway in Poland will now go ahead following the granting of permission from the local authorities in the Mazowieckie area. In total the two stretches of the S17 will measure over 25km long. One of the stretches will connect Gonczyce with the ring road around Garwolin and will measure 12.2km. The other stretch runs from Lubelskie through Mazowieckie to Gonczyce and is 13km long. The work is being carried out by the contractor Budimex. Work on a further 95km stretch of the S1
  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.