Skip to main content

Budimex and Strabag win 16km of Poland’s four-lane A1

Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
August 6, 2018 Read time: 1 min
3302 Budimex and 945 Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów.


The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months.

The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.

“The A1 in Poland is an important link between the ports in the north of the country and the south of Europe. We are pleased to have again received an order for a section in the course of the expansion of the A1,” said Thomas Birtel, chief executive of Strabag.

For more information on companies in this article

Related Content

  • Strabag-led consortium wins €178 million R2 Slovakia expressway contract
    November 22, 2013
    A consortium led by the European construction group Strabag has signed the €178 million contract to build the 10.4km long section of the R2 expressway between Pstruša and Kriván in Slovakia. The R2 expressway runs through the valley of the Slatina River in central Slovakia and links the cities of Pstruša and Kriván. “After years of restraint in public-sector expenditures, the Slovak construction industry is again beginning to recover. We are bidding for several large contracts that are currently in the t
  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan