Skip to main content

Budimex and Strabag win 16km of Poland’s four-lane A1

Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
August 6, 2018 Read time: 1 min
3302 Budimex and 945 Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów.


The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months.

The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.

“The A1 in Poland is an important link between the ports in the north of the country and the south of Europe. We are pleased to have again received an order for a section in the course of the expansion of the A1,” said Thomas Birtel, chief executive of Strabag.

For more information on companies in this article

Related Content

  • STRABAG wins Austria highway widening deal
    October 6, 2016
    STRABAG will handle the contract to widen Austria’s A1 highway in Austria between Matzleinsdorf and Pöchlarn. The €22 million contract involves widening to three lanes and has a scheduled completion date of May 2018. The contract also includes widening eight bridges along the 5.1km section. Construction work is now underway on the project.
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • Strabag ends 2016 with a record order backlog
    April 27, 2017
    The Austrian publicly listed construction group Strabag posted a record year 2016, with an order backlog at a record-high of €14.8 billion. Thomas Birtel, chief executive of Strabag, said that 2016 was a “satisfactory and eventful” year for the company. “We managed to acquire the minority interest in our subsidiary [civil engineering company] Ed Züblin in Stuttgart and of the remaining stake in Raiffeisen evolution, now called Strabag Real Estate.” Both companies are now wholly owned by Strabag. Consolidate
  • German viaduct deal for STRABAG
    July 26, 2024
    STRABAG will handle a German road viaduct project in Hessen.