Skip to main content

Budimex and Strabag win 16km of Poland’s four-lane A1

Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
August 6, 2018 Read time: 1 min
3302 Budimex and 945 Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów.


The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months.

The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.

“The A1 in Poland is an important link between the ports in the north of the country and the south of Europe. We are pleased to have again received an order for a section in the course of the expansion of the A1,” said Thomas Birtel, chief executive of Strabag.

For more information on companies in this article

Related Content

  • Stockholm tunnel section awarded
    November 21, 2017
    Contractor STRABAG will construct an additional section of road tunnel for Stockholm’s new bypass project. The contract is worth around €45 million and involves building two parallel bores with a total length of 2.5km for the Akalla tunnel section. The Stockholm bypass runs around the Swedish capital and is currently the largest road construction and tunnelling project in the country. The parallel tunnel bores will both be around 1.23km long and will be driven using conventional drilling and blasting
  • Trakcja and Mostostal Warszawa pick up S61 deal in Poland
    July 25, 2018
    A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
  • Morocco’s new motorway links are boosting connectivity
    December 16, 2014
    Morocco’s massive motorway construction programme will improve transport connections and boost this North African country’s economy - Mike Woof reports A massive road building programme is transforming Morocco, with new motorways connecting cities and major towns, as well as many new rural roads being built. The Moroccan Government has set an impressive plan for its infrastructure investment that will see even the country’s small and remote villages having proper connections to the main road network. The
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.