Skip to main content

Brazil’s ANTT launches public consultation for NovaDutra extension

Brazil's national land transport agency ANTT has launched a public consultation concerning a proposed contract extension of 13 years for the NovaDutra highway concession held by CCR. The deal covers the Rodovia Presidente Dutra highway between Rio de Janeiro and Sao Paulo, according to a report by the Valor Economico newspaper. Consultations will run for 30 days until mid-April and include two sessions in Sao Paulo and Rio de Janeiro.
March 18, 2016 Read time: 2 mins
Brazil's national land transport agency ANTT has launched a public consultation concerning a proposed contract extension of 13 years for the NovaDutra highway concession held by CCR.

The deal covers the Rodovia Presidente Dutra highway between Rio de Janeiro and Sao Paulo, according to a report by the Valor Economico newspaper.

Consultations will run for 30 days until mid-April and include two sessions in Sao Paulo and Rio de Janeiro.

Discussions for the contract, which expires in 2021, will consider five investment scenarios for between US$475 million and $950 million, depending on the volume of work.

The only work confirmed up till now is for construction of an entry ramp for the Serra das Araras stretch in Pirai, Rio de Janeiro, costing around $475 million.

CCR has proposed other work to improve safety on minor roads connecting with the Dutra highway in a number of regions. However, observers believe the government is reluctant to spend much more than the $475 million, despite the claimed added safety benefits.

Meanwhile, Valor Economico newspaper also reports that some contractors for road and airport tenders have reported continuing difficulties in securing the public credit that was offered to them at the time of their tender wins.

Only three of the six projects tendered by the Rousseff government which required long-term financing by the Brazilian Development Bank BNDES have been granted monies, according to Valor Economico. These include projects operated by Triunfo Participacoes e Investimentos, CCR and MGO Rodovias.

Odebrecht and Invepar have been granted bridge-loans for their road projects.

Galvao is yet to receive any financing from BNDES for work on the BR-153 road, for which the tender was awarded in 2014. This project was, however, affected by the involvement of Galvao in the Lava-Jato corruption investigation which led to BNDES suspending all loans for the project, the newspaper reported. There is speculation that this contract could transferred to another company.

BNDES has declined to comment on the reasons behind the delayed release of financing for the projects, but notes it is continuing to work to ensure all funds are granted.

Related Content

  • Increased infrastructure spending
    February 22, 2012
    With economies booming in the BRIC countries and other regions, spending on infrastructure is at a high - Patrick Smith reports As economic crisis grips much of the world, many countries are still spending billions on infrastructure to improve transportation. While the USA and Europe struggle with debt problems (and this has affected much of the rest of the world) the development of highways, airport, ports and other infrastructure is gathering pace in other regions to boost economic developments.
  • Brazil delaying key infrastructure projects
    March 25, 2015
    Brazi llooks set to delay a number of key infrastructure projects until 2016. The Brazilian Federal Government's planned transport sector concession tenders will see investments close to US$46.58 billion in all. But these will be pushed back to 2016 due to the difficulty of launching all auctions in 2015 due to technical, economic and political limits. The tenders are revised versions of those promised previously. However only the airport tenders having been launched with success. Due to revisions in the pl
  • Brazil launches Projeto Crescer privatisation plan
    September 21, 2016
    Motorways are among the 25 infrastructure projects that Brazil’s new president, Michel Temer, intends to privatise in an attempt to revive the flagging economy. Other projects in the Projeto Crescer - Project Growth – plan include airports, rail lines, sewage systems, energy distributors and gas and oil fields. All the projects should be in majority private hands by 2018, he said during the announcement. “We will increasingly show that the government cannot do everything. We need to have the presen
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi