Skip to main content

Brazil launches Projeto Crescer privatisation plan

Motorways are among the 25 infrastructure projects that Brazil’s new president, Michel Temer, intends to privatise in an attempt to revive the flagging economy. Other projects in the Projeto Crescer - Project Growth – plan include airports, rail lines, sewage systems, energy distributors and gas and oil fields. All the projects should be in majority private hands by 2018, he said during the announcement. “We will increasingly show that the government cannot do everything. We need to have the presen
September 21, 2016 Read time: 3 mins
Brazil seeks greener infrastructure pastures
Motorways are among the 25 infrastructure projects that Brazil’s new president, Michel Temer, intends to privatise in an attempt to revive the flagging economy.

Other projects in the Projeto Crescer - Project Growth – plan include airports, rail lines, sewage systems, energy distributors and gas and oil fields.

All the projects should be in majority private hands by 2018, he said during the announcement.

“We will increasingly show that the government cannot do everything. We need to have the presence of the private sector as a promoter of development and a producer of jobs in the country,” said Temer, who is the former vice-president.

Temer rose to the presidency after Dilma Rousseff was removed from office on charges of illegally shifting government funds between budgets. Temer has promised to pull the economy out of recession by making reforms and attracting foreign investors.

Rio Times newspaper reported that the government’s first projects headed for the auction block are the airports of Porto Alegre, Salvador, Florianópolis and Fortaleza, in the first quarter of next year.

Several federal highways and rail lines will be sold off next year and proposals will be published in English in hopes of attracting much needed foreign investment.

Executive secretary of the Investment Partnership Programme (IPP), Moreira Franco, said the government’s plan is to usher in an era of “maximum technical accuracy”. A project’s capacity to generate returns for investors – and society in general – will be based on solid arithimetic.

“There will be no replacement of arithmetic by ideology,” said Franco. “Return rates and tariffs will be based on technical studies, not the will of president, minister or whomever,” said the official.

Franco said all contracts will have performance indicators to set the quality of service. Investors will know what targets will need to be achieved and how they will be measured.

There will also be an emphasis on only those projects with proven environmental feasibility studies.

Temer’s presidency backed by his centre-right PMDB party ends 13 years of government by Rousseff’s left-wing Workers' Party, the BBC reported. The economy is struggling under a huge budget deficit amid the country's worst recession in 80 years. Brazil's economy contracted 3.8% last year, and is expected to shrink a further 4.3% this year, according to the Organisation for Economic Co-operation and Development (OECD).

According to the Brazilian association of roadworks companies, Aneor, some $2.45 billion is needed to improve, maintain and repair the country’s federal roads/year.

The results from the country’s national transport confederation (CNT) said there was a 13.1% increase in the number of sections of road now in a critical condition, with serious risks to user safety. CNT has stated that it believes that the Brazilian Government should speed up road privatisation projects in a bid to tackle the problem.

Related Content

  • Brazil road condition analysed
    August 1, 2016
    A report is being compiled in Brazil regarding the state of the country’s road network. The report was compiled by the country’s national transport confederation, CNT, in July 2016. The report is due to be released in October 2016. However CNT says it is pessimistic about what the report will state. This is due to cuts in public investment in roads and delays in the launch of concession programmes. Brazil’s 2016 federal road budget has been set US$2.03 billion. However up to $1.3 billion had to be used to p
  • Delays blight Brazil’s highway programme
    August 4, 2016
    Around 130 road projects are facing delays in Brazil, according to a data from Brazil's national land transport association ANTT. A report in the newspaper O Estado de Paulo noted that many delays are caused by problems with environmental licences and expropriations, as well as a decrease in road traffic due to the economic crisis. Among projects that were meant to have been completed are those by concession holders Rota do Oeste for the Via 040, Concebra for the Eco 101 and MSVia and Galvão for BR-15
  • Brazil infrastructure projects being privatised?
    May 18, 2015
    The Brazilian Government is considering increasing the number of projects being privatised in a bid to boost investment in the country. Brazilian president Dilma Rousseff has suggested increasing the number of federal roads included in the privatisation programme from four to 11. The economic team has presented 20 new road stretches to be considered for inclusion in the programme. These routes will be studied in order to determine which will generate the most interest from the private sector, with six or se
  • Modified asphalt trials in Brazil
    October 17, 2012
    An urgent need to improve and extend its road network means that Brazil is open to innovation and new ideas - the timing looks good for Kraton and its highly modified asphalt. Kristina Smith reports On 15th August Brazilian president Dilma Rousseff announced a US$66 billion (BRL 133 billion) investment package for the country’s road and rail networks. Of that, $21 billion (BRL 42 billion) is earmarked for the upgrade or construction of 7,500km of highways through a series of concessions. “We’re starting an