Skip to main content

Bosnia tunnel tender opening for bidding

The tender process is opening in Bosnia for a key tunnel project. The new Racin to Ivan Tunnel section will form part of the important Corridor 5C route. Financing for the project is being provided by the European Investment Bank (EIB). The work is expected to cost €50 million and the project will be managed by Bosnia’s state-owned road business, Autoceste FbiH.
July 18, 2019 Read time: 1 min

The tender process is opening in Bosnia for a key tunnel project. The new Racin to Ivan Tunnel section will form part of the important Corridor 5C route. Financing for the project is being provided by the European Investment Bank (EIB). The work is expected to cost €50 million and the project will be managed by Bosnia’s state-owned road business, Autoceste FbiH.

Related Content

  • JP Autoceste launches Hranjen Tunnel tender
    September 12, 2023
    The tunnel is part of the Praca-Gorazde expressway that will link the Bosnian capital Sarajevo to the town of Gorazde.
  • Bosnia: Hranjen Tunnel job to restart
    December 13, 2021
    Meanwhile, Bosnia has set aside money for Zupci and Klobuk border upgrades.
  • Concerns over bidding for Pocitelj Bridge work surface in Bosnia
    January 12, 2017
    A Bosnian minister has expressed concern over the difference between bids by two consortia for a motorway project that includes construction of the Pocitelj Bridge. Bosnia's state-owned motorway company Autoceste FBiH said in May that it had signed a contract worth nearly €108 million with the joint venture of Euroasfalt and Strabag for construction of the 5.8km Klopce-Donja Gracanica subsection of pan-European transport Corridor Vc. A report by the Bosnian news agency Fena said that Bosnia's deputy m
  • IFC to provide consultancy on three-section Corridor Vc works
    May 3, 2013
    JP Autoceste FBiH, the state-owned motorway company of Bosnia's Muslim–Croat Federation, has revealed that the International Finance Corporation (IFC) will provide consultancy for finding a private partner for three sections of Corridor Vc. The IFC consultancy-covered sections are Doboj Jug (Karusa)-Medakovo (4km); Medakovo-Ozimica (21km); and Ozimica-Poprikusa (13.7km). The consultancy deal will last for a period of 15 months during which a due diligence of costs and a study for the three Corridor Vc secti