Skip to main content

Bosnia gets €750 million loan for Corridor 5C motorway

Bosnia has signed a European loan agreement worth €750 million for several sections of work on the Corridor 5V motorway project. Denis Zvizdic, head of government for Bosnia and Herzegovina, said the deal was signed in London during a recent investment conference on the western Balkans. Of the loan amount, the Federation of Bosnia and Herzegovina will get €500 million and the internal but autonomous Republika Srpska will receive €250 million. The money will be used for constructing four 70km sections of
March 1, 2018 Read time: 2 mins

Bosnia has signed a European loan agreement worth €750 million for several sections of work on the Corridor 5V motorway project.

Denis Zvizdic, head of government for Bosnia and Herzegovina, said the deal was signed in London during a recent investment conference on the western Balkans.

Of the loan amount, the Federation of Bosnia and Herzegovina will get €500 million and the internal but autonomous Republika Srpska will receive €250 million.

The money will be used for constructing four 70km sections of Corridor 5C (Corridor Vc) that runs from Kiev in the Ukraine to Slovakia and Hungary and on through Bosnia to Croatia’s Adriatic coast. The longest single-country stretch lies in Bosnia and Herzegovina, covering 337km.

In mid-2014, a 6km stretch of the highway between Sarajevo and Zenica was opened that included a 3km-loong tunnel. The March 1 tunnel, named after date of Bosnia's independence referendum, meant that the journey between the two cities was cut from one hour to 30 minutes.

The tunnel cost around €62 million had been under construction for several years, first by two Slovenian companies that eventually which went bankrupt, and later by a consortium of Bosnian companies, according to a report by Balkan Insight at the time. The tunnel is the longest in Bosnia and is one of the most important infrastructure projects to be completed since the 1992-5 war.

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Bosnia invests in roads and highway construction
    May 15, 2012
    The Government of Federal Bosnia & Herzegovina plans to invest e5.5 billion in building roads, highways and new energy projects. To achieve this programme a new consortium will be set-up to secure part of the necessary capital, while part will be financed by strategic partners. The authorities are also working on plans for construction of the Corridor 5c highway.
  • Bosnia tags China Shandong to build Banja Luka-Prijedor motorway
    February 16, 2018
    Bosnia’s autonomous Republika Srpska has picked China Shandong International and Technical Cooperation to construct and operate the Banja Luka-Prijedor motorway. Talks with China Shandong start this month for the 25-30 year concession for the 42km motorway. The company will fund construction and then collect tolls as part of repayment, according to media reports. The cost is estimated to be around €298 million and construction finish is expected to be in 2023. In November, Autoputevi RS, Republika Srpska
  • Bosnia tunnel project; work starting
    November 1, 2019
    Construction work is due to start on the Prenj Tunnel project in Bosnia. The tunnel will form part of the important Corridor 5C route. Measuring 10km in length, the road and tunnel project is expected to cost €820 million to build. Funding is being supplied jointly by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD). The Bosnian Government has also secured a portion of the necessary funding from Bosnian banks. In addition, a contract has been agreed for the