Skip to main content

Austria-Slovenia tunnel project awarded

Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
August 9, 2018 Read time: 1 min
Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft.


The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as well as installing the latest fire protection facilities and communication systems.

Construction of the first tunnel commences in 1986 and this was opened to traffic in 1991. The tunnel links the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana. The road tunnel forms part of the transport axis Munich-Salzburg-Ljubljana-Thessaloniki, also called Pan-European Corridor-X.

Related Content

  • Nepal's highway plans
    March 22, 2012
    The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.
  • $1 billion Bengaluru road tunnel
    June 25, 2025
    A $1 billion Bengaluru road tunnel project is planned.
  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • Lumitex lights up Melbourne's EastLink tunnels
    June 18, 2021
    The 1,066 high-pressure sodium lights have been exchanged for 1,174 Lumitex LEDs throughout the EastLink network's 1.6km twin tunnel complex in Melbourne, Australia.