Skip to main content

New design for Sydney’s WestConnex motorway project third stage

Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
November 14, 2016 Read time: 2 mins
Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports.

The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state.

Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper.

The projects overall cost is set at nearly $12.7 billion

New South Wales roads minister Duncan Gay said that if the twin tunnels from Haberfield to St Peters for the M4-M5 Link were to be built as a separate contract, they could open in 2022.

"This stage of WestConnex is the most important because it's the missing link which finally joins the M4 and M5 motorways together," he said.

The project is being carried out in three stages, with the first for the widening of the existing M4 Motorway as well as a 5.5km tunnel extension. The second stage (WestConnex M5) includes building a 9km tunnel, which will more than double capacity of the existing M5 East motorway corridor and provide an interchange, north of the city’s airport. The third stage (WestConnex M4-M5 Link) will link stages 1 and 2 through a new road tunnel, connecting the M4 and M5 corridors.

In January this year, 2376 Egis Projects and its partner 6191 Fulton Hogan Construction were awarded the contract for the operation and maintenance of WestConnex. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.

The deal is of significance as the WestConnex link is Australia’s largest road infrastructure project. The construction work is being carried out by SMC, a private corporation, whose shareholders include the Ministry for Roads, Maritime and Freight and the Treasurer of NSW.

For more information on companies in this article

Related Content

  • Partners win highway operation deal in New South Wales, Australia
    January 11, 2016
    Egis Projects and its partner Fulton Hogan Construction have won a major contract for the operation and maintenance of the WestConnex highway link in New South Wales Australia. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.
  • Another tunnel for Australia’s WestConnex toll road project?
    July 21, 2016
    The size of Australia’s largest infrastructure project could get bigger with the addition of another tunnel, according to media reports. The New South Wales state government is considering another tunnel, around 1km long, in the inner west, expanding the size of Sydney's WestConnex toll road project, according to the Sydney Motorway Corporation, which along with its state government client, Roads and Maritime Services, is in charge or the US$12.74 billion project. Sydney Motorway was set up in 2014 an
  • New South Wales is seeking financial packers for WestConnex in Sydney
    June 19, 2015
    Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
  • Third stage of Sydney’s WestConnex tunnel to be 1km longer
    December 4, 2014
    Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state. The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney. The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023.