Skip to main content

Australia road contract awarded to South Korean firm

The 13km M4-M5 Link in Sydney, Australia is to be constructed by the South Korean contractor, Samsung C&T. The project is worth US$788.5 million. The new link will be constructed as an underpass and is due for completion in mid-2023.
August 22, 2018 Read time: 1 min

The 13km M4-M5 Link in Sydney, Australia is to be constructed by the South Korean contractor, 1026 Samsung C&T. The project is worth US$788.5 million. The new link will be constructed as an underpass and is due for completion in mid-2023.

For more information on companies in this article

Related Content

  • Bahrain work on track
    February 6, 2012
    Work on Bahrain's Eisa Town Gate Intersection project is to get back on track shortly. The work stopped when South Korean contractor Sungwon was afflicted by financial issues due to funding problems encountered in Dubai and South Korea.
  • Construction underway for Nigeria's $10 billion coastal highway
    May 1, 2025
    Construction is underway for Nigeria’s new $10 billion coastal highway.
  • South Korean technology for thin overlays
    May 15, 2019
    South Korean company Hansoo Road Industry has developed an ultra-thin hot mix asphalt pavement layer, Recover asphalt, designed to overlay cracked pavements at a depth of between 10 and 20mm. “Our company has been studying asphalt modifiers since 1999 and has know-how on research and development of asphalt modifiers,” said Yulia Min, manager at Hansoo Road Industry. “Recover asphalt was developed through a four-year study based on the previous studies of asphalt modifier technology.” Recover asphalt has
  • Concrete barrier challenge
    February 15, 2012
    The 5700C-Max unit from Power Curbers has now been used on a tricky shoulder widening job in New South Wales, Australia. The machine carried out the job close to Robertson in the Southern Highlands, about 1.5 hours drive to the south of Sydney. The job required the construction of a 200m long section of barrier, built to the requirements of the Roads and Traffic Authority (RTA). The contractor hand-formed the concrete shoulder as it was about 3m wide at the start and narrowed down to 1m at the end.