Skip to main content

Atlanta SR 400 Express Lanes project awarded

The 20km project, awarded by the Georgia Department of Transportation in the US, went to the SR 400 Peach Partners, that includes ACS, Acciona and Meridiam.
By David Arminas September 2, 2024 Read time: 2 mins
Dragados USA and Acciona Construction USA will be responsible for the design and construction, while Acciona Concesiones and ACS Infrastructure Development will be in charge of maintenance (image courtesy ACS/SR 400 Peach Partners)

ACS and Acciona from Spain French infrastructure investment firm Meridiam will design, build, finance and operate the SR 400 Express Lanes project in Atlanta.

The 20km project, awarded as a public-private partnership model by the Georgia Department of Transportation, will take around six years to complete and is worth about US$8.65 billion.

Dragados USA and Acciona Construction USA will be responsible for the design and construction, while Acciona Concesiones and ACS Infrastructure Development will be in charge of maintenance.

According to GDoT, The project will add new express lanes in both directions along a 24km section of SR 400. Similar to the other operational Georgia Express Lanes facilities in the metro area, the new express lanes will have variable-priced tolling. There will also bje for the first time along the SR 400 bus rapid transit.

Construction is expected to start next year with completion in 2031.

The Georgia Department of Transportation (Georgia DOT) and the State Road and Tollway Authority (SRTA) together said that they had used “a best-value procurement method” for the project. The method scores both technical approach and financial proposals with SR 400 Peach Partners, which also includes civil construction firms Dragados and Parsons.

The private sector partner will incentivise the use of the express lanes over the 50-year partnership. Toll rates will be subject to the tollway authority’s contractual requirements. The SR 400 Express Lanes will operate with the use of a Peach Pass transponder or another interoperable transponder. Customer billing will be performed by the tolling authority as it is with the four express lanes facilities currently operational in Georgia.

The SR 400 Express Lanes will be part of the larger Georgia Express Lanes Network.

For a short video presentation by SR 400 Peach Partners, click here.

For more information on companies in this article

Related Content

  • Ramboll appointed independent engineer on Champlain Bridge Project
    September 8, 2015
    Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
  • Kewatkhali Bridge construction to start
    October 11, 2023
    The project in Bangladesh for the steel arch bridge includes a 6.2km four-lane approach road.
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Bangladesh highway contract awarded
    November 15, 2022
    A major Bangladesh highway contract has been awarded.