Skip to main content

Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala

Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
March 3, 2016 Read time: 3 mins
1324 Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala.

The contract, awarded by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E 77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

Astaldi’s other infrastructure contracts includes metros in Milan, Genoa, Warsaw and in Caracas, Venezuela, as well as the high-profile Large Electron-Positron Collider for CERN, Switzerland.

Last year, Italian firm 7809 Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of 2017. Meanwhile, a consortium headed by 3302 Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a 945 Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

Astaldi announced last month that, as part of the Consortium ACe, it had won the design and construction contract for the dome and main structure of the European Extremely Large Telescope. The E-ELT will be built in Chile on the Cerro Armazones, in the central part of the Atacama desert, at 3,000m above sea level. Consortium ACe comprises Astaldi (65%, leader) and Cimolai (35%), with EIE Group, an international leader in management, design and production in the fields of astronomy and astrophysics.

Related Content

  • Polish plans progressing
    October 3, 2014
    Plans are moving forward for a series of key highway projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion.
  • Polish road tender underway
    February 3, 2015
    Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Polish road projects commencing shortly
    November 19, 2015
    Two major road projects are planned for Poland. Spanish construction firm Dragados intends to start work building a 25km ring road around the Polish city of Radom in the second half of 2016. The road will cost over €171.67 million to construct and will be completed in 2018. The work includes building four bridges, four junctions and two pedestrian bridges. The new ring road will form a part of the S7 road and reduce journey time between Krakow, Kielce and Warsaw.