Skip to main content

Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala

Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
March 3, 2016 Read time: 3 mins
1324 Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala.

The contract, awarded by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E 77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

Astaldi’s other infrastructure contracts includes metros in Milan, Genoa, Warsaw and in Caracas, Venezuela, as well as the high-profile Large Electron-Positron Collider for CERN, Switzerland.

Last year, Italian firm 7809 Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of 2017. Meanwhile, a consortium headed by 3302 Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a 945 Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

Astaldi announced last month that, as part of the Consortium ACe, it had won the design and construction contract for the dome and main structure of the European Extremely Large Telescope. The E-ELT will be built in Chile on the Cerro Armazones, in the central part of the Atacama desert, at 3,000m above sea level. Consortium ACe comprises Astaldi (65%, leader) and Cimolai (35%), with EIE Group, an international leader in management, design and production in the fields of astronomy and astrophysics.

Related Content

  • Metrostav and Budimex among bidders for Poland’s S7 section
    April 25, 2017
    Poland’s highways directorate, GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction. Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of Porr Polska Infrastructure and Porr Bau. Other bidders include others, Budimex, Intercor and Polaqua.
  • New Polish highway projects are being planned
    August 11, 2014
    Plans are moving forward for two key highway projects in Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that the best offer for the construction of the Rzeszow - Jaroslaw section of the A4 highway has been submitted by a consortium comprising contractors Budimex and Strabag. The deal is worth some €170.63 million. Meanwhile Italian construction company Astaldi has signed a contract worth €103.23 million with GDDKiA for the S8 dual carriageway. The section of road will
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan