Skip to main content

Another bridge over the River Drina

Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
By David Arminas October 29, 2020 Read time: 2 mins
March opening likely for Bratoljub Bridge (photo courtesy of newspaper Nezavisne Novine)

The Bratoljub Bridge between Serbia and the autonomous Bosnian entity of Republika Srpska is set to open in March after years of delays.

Local media reported that Radovan Viskovic, prime minister of the Republika Srpska, announced the date.

News reports in mid-2016 said Serbia’s ministry of construction announced that the bridge was soon to be completed, at a cost of around €13 million. Serbia reportedly was building the entire two-lane 227m-long bridge that will also have a cycle and pedestrian lane on each side.

The bridge connects the Serbian town of Ljubovija and the town of Bratunac in Republika Srpska on the Bosnian side of the River Drina.

The process for agreeing a new bridge over the Drina  began in 2013 and was formalised in 2016 for construction to start soon after. Although the bridge was mostly built, the project stalled over construction of the connecting roads on each side of the structure.

On the Bosnian side, the government of the Federation of Bosnia and Herzegovina was to build the border crossing within the municipality of Bratunac in Republika Srpska, a constituent part of federated Bosnia and Herzegovina. Meanwhile, the government of  Republika Srpska was to build the access road to the bridge.

Disagreements between the Bosnian government and that of Republika Srpska delayed construction work.

Media reported that the contractor has been MBA-Ratko Mitrović Civil Engineering, based in the Serbian capital Belgrade, and the project was led by the Traffic Institute CIP Belgrade, also in Belgrade.

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.
  • Major Russian bridge projects underway
    December 13, 2017
    A series of major bridge projects are underway in Russia, in the Krasnodar Region, Novosibirsk and the Surgut District. A new bridge being built in the Krasnodar Region is expected to be open to vehicle traffic at the end of 2018. Work on the bridge supports is being completed at present and work on the deck is now underway. The bridge will also carry rail traffic from the end of 2019. Meanwhile in Novosibirsk, construction is commencing on a new bridge spanning the Ob River. This will be the fourth bridge
  • Kewatkhali Bridge construction to start
    October 11, 2023
    The project in Bangladesh for the steel arch bridge includes a 6.2km four-lane approach road.