Skip to main content

Another bridge over the River Drina

Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
By David Arminas October 29, 2020 Read time: 2 mins
March opening likely for Bratoljub Bridge (photo courtesy of newspaper Nezavisne Novine)

The Bratoljub Bridge between Serbia and the autonomous Bosnian entity of Republika Srpska is set to open in March after years of delays.

Local media reported that Radovan Viskovic, prime minister of the Republika Srpska, announced the date.

News reports in mid-2016 said Serbia’s ministry of construction announced that the bridge was soon to be completed, at a cost of around €13 million. Serbia reportedly was building the entire two-lane 227m-long bridge that will also have a cycle and pedestrian lane on each side.

The bridge connects the Serbian town of Ljubovija and the town of Bratunac in Republika Srpska on the Bosnian side of the River Drina.

The process for agreeing a new bridge over the Drina  began in 2013 and was formalised in 2016 for construction to start soon after. Although the bridge was mostly built, the project stalled over construction of the connecting roads on each side of the structure.

On the Bosnian side, the government of the Federation of Bosnia and Herzegovina was to build the border crossing within the municipality of Bratunac in Republika Srpska, a constituent part of federated Bosnia and Herzegovina. Meanwhile, the government of  Republika Srpska was to build the access road to the bridge.

Disagreements between the Bosnian government and that of Republika Srpska delayed construction work.

Media reported that the contractor has been MBA-Ratko Mitrović Civil Engineering, based in the Serbian capital Belgrade, and the project was led by the Traffic Institute CIP Belgrade, also in Belgrade.

Related Content

  • Tender process starts for Bosnian highway project
    May 10, 2012
    The tender process to construct a €1.3 billion highway project in the Bosnian autonomous entity of Republika Srpska is underway and will be open until 2 September, 2011. Bosnia's Ministry of Transport has held talks with a total of five companies so far. The highway will run from Glamocani through Banja Luka and to the town of Mrkonjic.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Work starts on last Sofia-Kalotina section
    May 24, 2023
    Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.
  • Legal battle for Croatia’s Peljeski Bridge contract continues
    April 19, 2018
    Only days after Croatia rejected initial complaints, contractors Astaldi, Ictas and Strabag said that they will submit new complaints over the Peljeski bridge winning bid. Croatian media report that Turkey's Ictas, Italy's Astaldi and the Austrian company Strabag are planning to submit a new complaint to the Croatian High Court against a decision by the state procurement authority DKOM to reject their previous complaints. At issue is the awarding of the Peljeski bridge and access roads project to the