Skip to main content

Acciona, Leonhard Nilsen & Sonner and Multiconsult win Norway E6

Spain’s Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway. The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.
July 23, 2018 Read time: 1 min
Spain’s 976 Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway.


The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.

Works, which include several tunnels, is set to finish at the end of 2024 or start of 2025.

European route E6 runs nearly 3,100km from Trelleborg on the tip of neighbouring Sweden and into Norway, to run along its North Sea coast to the Arctic Circle and Nordkapp. The route ends in Kirkenes, close to the Russian border.

For more information on companies in this article

Related Content

  • Trevi Group posting strong results
    July 5, 2022
    Orders acquired by the Group in the first five months of 2022 amounted to €342.8 million.
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • Fourth lane for Rome section of Italy’s A1
    June 28, 2023
    Under the agreement, around 16 hectares of trees will be planted, 3.4km of noise barriers installed and a network of cycle paths will be planned.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi