Skip to main content

Acciona, Leonhard Nilsen & Sonner and Multiconsult win Norway E6

Spain’s Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway. The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.
July 23, 2018 Read time: 1 min
Spain’s 976 Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway.


The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.

Works, which include several tunnels, is set to finish at the end of 2024 or start of 2025.

European route E6 runs nearly 3,100km from Trelleborg on the tip of neighbouring Sweden and into Norway, to run along its North Sea coast to the Arctic Circle and Nordkapp. The route ends in Kirkenes, close to the Russian border.

For more information on companies in this article

Related Content

  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Armenia north-south highway route
    October 9, 2017
    Plans are being drawn up in Armenia for the new North-South Highway project. Measuring some 556km in all, the project is expected to cost in excess of US$2 billion to construct, although there it is possible that the final pricetag will be somewhat higher. The country's Ministry of Transport says that the southern section of the highway between Artashat and Megri will cost $1.5 billion to build alone.
  • Danish SolarFuture builds solar facility by Öresund Bridge
    January 10, 2018
    Solar cell panels worth around €270,000 will produce energy for the Øresund Bridge that connects Denmark and Sweden. Danish companies SolarFuture and Solarpark DK have been awarded the contract to install 1,500m² solar panels near the toll station of the Øresund Bridge. The three-year agreement is with Øresundsbro Konsortiet - the Danish-Swedish company that owns and operates the Øresund Bridge. The panel will generate around 4% of the power to operate the bridge, including deck lighting and