Skip to main content

Acciona, Leonhard Nilsen & Sonner and Multiconsult win Norway E6

Spain’s Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway. The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.
July 23, 2018 Read time: 1 min
Spain’s 976 Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway.


The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.

Works, which include several tunnels, is set to finish at the end of 2024 or start of 2025.

European route E6 runs nearly 3,100km from Trelleborg on the tip of neighbouring Sweden and into Norway, to run along its North Sea coast to the Arctic Circle and Nordkapp. The route ends in Kirkenes, close to the Russian border.

For more information on companies in this article

Related Content

  • Seven bids submitted for Croatia’s Peljeski bridge access roads
    June 18, 2018
    Croatia’s construction company Integral Inzinjering has submitted the lowest bid of €43 million for construction of access roads for the Peljeski bridge project. Croatian daily newspaper Vecernji List reported that seven bidsd were submitted for the 12.4km project. Highest bid of €88 million has come from China Road and Bridge Corporation, which has the contract to build the bridge. Austria's Strabag offered €65 million. Other bidders were France's Colas, Croatia's GP Krk in cooperation with the Bosni
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e