Skip to main content

Perkins Platinum Protection extends warranty for up to five years

Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines. With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.
April 20, 2016 Read time: 1 min

299 Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines.

With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.

All videos

For more information on companies in this article

Related Content

  • Construction industry can take advantage of new technologies to reduce carbon emissions
    April 19, 2016
    The construction industry can lower its carbon emissions by taking advantage of technology advances in three areas – electro-mobility, intelligent machines and connected machines, said David Ross, vp of advanced technology and verification, Volvo Construction Equipment, who spoke at a seminar on climate challenges in infrastructure projects at bauma that the company hosted. With buildings contributing 30% to global emissions across their life cycle including construction and demolition, the industry needs t
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w
  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    February 10, 2016
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending
  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    January 6, 2017
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending