Skip to main content

Hitachi: new European parts centre

Hitachi Construction Machinery (Europe)/(HCME) has said that it is increasing its focus on the supply of spare parts with the opening of a new European parts centre in April 2011. This represents a significant investment of €e12million in the 53,000m2 facility (22,000m2 covered), formerly owned by the car manufacturer Citroën and located in the city of Oosterhout in the south of The Netherlands. HCME's existing 7,600m2 European parts centre is also situated in Oosterhout, but the move to the new complex wil
February 8, 2012 Read time: 2 mins
233 Hitachi Construction Machinery (Europe)/(HCME) has said that it is increasing its focus on the supply of spare parts with the opening of a new European parts centre in April 2011.

This represents a significant investment of €e12million in the 53,000m2 facility (22,000m2 covered), formerly owned by the car manufacturer Citroën and located in the city of Oosterhout in the south of The Netherlands.

HCME's existing 7,600m2 European parts centre is also situated in Oosterhout, but the move to the new complex will help to enhance the Hitachi support chain after-sales programme. The supply of Hitachi genuine parts is a key link in the 'chain of service' provided by HCME to protect its customers' investment in Hitachi construction machinery.

The new state-of-the-art centre will have the capacity to stock over 90,000 individual parts line items for onward distribution to authorised Hitachi dealers and customers throughout Europe, Middle East, Russia/CIS and Africa. This includes a special chemical storage area for Hitachi lubricants and a 14m high storage facility for larger items.

The warehouse activities will be supported by a dedicated warehouse management system, which will guide the warehouse operatives in unpacking received parts, storage, picking, packing and shipping. This system will enable more than 70 employees (42 in the warehouse) to handle up to 800 packages each day and 70,000 parts line items every month.

The overall aims of this strategic development are to meet the requirements of the Japanese manufacturer's expanding customer base and increase sales in this important sector of the construction industry.

"HCME is delighted that it has secured such an impressive new facility for its European parts operation. The collective goals are to increase the efficiency of the warehouse operation, to improve the storage and handling processes and to offer an enhanced level of service to Hitachi dealers and customers," says HCME parts general manager, Hiromasa Moriwaki.

"With parts availability increased up to 95%, this will also have a positive impact on HCME's business operations and reinforce its 'reliable solutions' corporate slogan."

For more information on companies in this article

Related Content

  • Hitachi appoints dealer in Latvia
    November 30, 2012
    Hitachi Construction Machinery (Europe) NV (HCME) has appointed Repa SIA as its new dealer for customers in Latvia. Repa, who replace Laadur OU, was established in 1991 as a dealer for used construction equipment. The head office is located in Riga and includes a 280m² office and 600m² workshops. The company employs seven sales personnel, ten technicians and six administrative staff. A subsidiary of the MONO Group, one of the largest enterprises in Latvia, and owner of companies specialising in highway engi
  • Hitachi EX1900-6 increases productivity at Swinden, UK quarry
    January 26, 2017
    Materials supplier Tarmac has invested in a Hitachi EX1900-6 ultra-large excavator for its Swinden Quarry in North Yorkshire, England. The EX1900-6 is used to load up to 1,200 tonnes of carboniferous limestone per hour directly into a 200tonne mobile crusher. A field conveyor takes the material to a secondary crusher at an average rate of 1,000tonnes/hour. The Hitachi model was supplied with a longer boom and arm, and a smaller 8m³ bucket, customary on a machine of this size. “This is because it needs
  • Mascus celebrates 10th year on-line
    February 28, 2012
    The on-line marketplace for construction machinery, Mascus, is now celebrating its 10th anniversary.
  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760