Skip to main content

HCME's new parts depot

The new Hitachi Construction Machinery (Europe)/HCME European Parts Depot has been officially opened. At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building. In his address, Mr Kikawa emphasised the imp
April 11, 2012 Read time: 2 mins
The new 233 Hitachi Construction Machinery (Europe)/1139 HCME European Parts Depot has been officially opened.

At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building.

In his address, Mr Kikawa emphasised the importance of the new facility, saying: "It is a great honour to officially open this new parts depot, and to have the opportunity to join my colleagues from HCME at such an important event in our history.

"The aim of the company investing in this larger, improved facility is to provide the best possible service to our dealers and customers. Parts availability has further increased due to the new facility's greater capacity and efficiency. This will help Hitachi to boost parts sales and meet the demands of our expanding customer base." The 53,000m² depot, which cost €12million, has a covered stock area that is three times the size of the previous Parts Distribution Centre, which was also situated in Oosterhout. It has the capacity to stock up to 90,000 individual parts lines at any one time and will be responsible for distributing them throughout Europe, Middle East, Russia/CIS and Africa. In addition to a special chemical storage area, it includes a 14-metre high storage area for larger items.

Efficiency will be ensured by a dedicated Warehouse Management System, which will guide operatives in unpacking and storing received parts, as well as picking, packing and shipping ordered items. It will employ a total of 70 people, who will have the potential to handle up to 800 packages each day and 70,000 parts items every month.

For more information on companies in this article

Related Content

  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • Strong attendance points to a successful bauma China show
    December 17, 2014
    Even heavy rain showers on the first day of the bauma China exhibition in Shanghai did not dissuade the crowds packing the outside exhibition areas - Mike Woof writes Those firms exhibiting at bauma China 2014 in Shanghai benefited from a strong show that attracted a record attendance of 191,000, an increase of 6% over the 2012 event. A wide array of new equipment was on show from the 3,104 firms exhibiting, an increase of 14% from 2012. There was a strong focus on technology and new engines required for
  • Eurobitume Congress: Prague promises
    June 22, 2016
    Held every four years, the Eurasphalt and Eurobitume congresses have a reputation for revealing developments that will shape the future of bitumen use on Europe’s roads. This year’s event in Prague promises to uphold that reputation. By Kristina Smith The list of locations for the Eurobitume and Eurasphalt (E&E) Congresses reads like a traveller’s dream itinerary: Strasbourg, Barcelona, Vienna, Copenhagen, Istanbul. Now the beautiful city of Prague has been added to the list. Between 1-3 June, presenter
  • Volvo wins on aggregate
    December 3, 2013
    In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th