Skip to main content

Doosan boosts parts support in the US

Doosan Infracore North America is boosting its support with the opening of a new parts distribution centre in the US. This facility will serve the firm’s dealers and Doosan customers in the United States and Canada. Strategically located, the new parts distribution center allows Doosan Infracore North America is said allow better support for dealers and customers with service options, deeper inventory and faster parts delivery. The parts distribution centre is located adjacent to the Doosan Infracore Nor
December 20, 2018 Read time: 2 mins
Doosan Infracore now has a new parts facility in the US

6902 Doosan Infracore North America is boosting its support with the opening of a new parts distribution centre in the US. This facility will serve the firm’s dealers and Doosan customers in the United States and Canada.

Strategically located, the new parts distribution center allows Doosan Infracore North America is said allow better support for dealers and customers with service options, deeper inventory and faster parts delivery. The parts distribution centre is located adjacent to the Doosan Infracore North America headquarters in Suwanee, Georgia, situated approximately 50km northeast of Atlanta.

 “Doosan is committed to being a top five construction equipment brand in North America, and this new parts distribution center illustrates our promise to support our dealers and our customers with parts availability and prompt delivery,” said Edward Song, CEO, Doosan Infracore North America.

The facility is designed for Doosan parts distribution and shipping. It is managed by DHL Supply Chain – the Americas’ leader in contract logistics. The center will stock approximately 40,000 stock keeping units (SKUs) that can be shipped to service Doosan construction equipment throughout the United States and Canada.

The parts distribution center will house a majority of Doosan parts, with only some low-volume parts needing to come from Doosan manufacturing facilities around the globe. DHL Supply Chain will provide outbound less than load (LTL) transportation to Doosan equipment dealers located in the United States and Canada.

For more information on companies in this article

Related Content

  • Attitude is key to sustainability, says Volvo CE’s Thomas Bitter
    June 27, 2018
    Whether you are in the global Volvo Ocean Race or working on-site locally, sustainability is about attitude as much as technology. David Arminas reports. Technology, sustainability and safety. We ignore these often related themes at our peril. This was the key point made by Volvo Group chief executive Martin Lundstedt during his brief opening presentation at the start of the Building Tomorrow Conference in Spain last October. The conference took place within the harbour of Alicante that was bustling wit
  • Are friends electric? – the drives
    October 3, 2018
    Advances in drive technology are being seen from several key firms as new generation, compact electric systems begin entering the market - Mike Woof writes Major innovations in machine systems are being seen in the construction equipment sector. Several manufacturers are hedging their bets with regard to drive technology and introducing electric drive machines, which will suit use in urban ultra-low emission zones. Wacker Neuson has developed an array of electric machines in recent years including a numbe
  • Advanced, low emission, fuel efficient earthmoving
    February 23, 2012
    Manufacturers are rolling out sophisticated machines for the European, North American and Japanese markets - Mike Woof reports. This year has been a pivotal period for the development of advanced, low emission earthmoving machines. During 2011 an array of manufacturers have introduced new models designed to comply with the latest Stage IIIB/Tier 4 Interim emissions regulations introduced for
  • Doka lays foundation stone for new logistics centre
    July 15, 2013
    Globally renowned formwork technology firm Doka has laid the foundation stone for its new logistics centre for Germany. The new 11.4 hectare facility, being built within an industrial estate on the B 87 highway near the town of Apolda in Thuringia, is earmarked for completion by the end of this year. The first phase will initially create around 40 new jobs. The Doka Group is investing around US$18.28 million (€14mn) in this initial phase, as part of the ongoing development of its worldwide distribution and