Skip to main content

Doka lays foundation stone for new logistics centre

Globally renowned formwork technology firm Doka has laid the foundation stone for its new logistics centre for Germany. The new 11.4 hectare facility, being built within an industrial estate on the B 87 highway near the town of Apolda in Thuringia, is earmarked for completion by the end of this year. The first phase will initially create around 40 new jobs. The Doka Group is investing around US$18.28 million (€14mn) in this initial phase, as part of the ongoing development of its worldwide distribution and
July 15, 2013 Read time: 2 mins
Computer-generated image of Doka’s new logistics centre in Germany
Globally renowned formwork technology firm 203 Doka has laid the foundation stone for its new logistics centre for Germany.

The new 11.4 hectare facility, being built within an industrial estate on the B 87 highway near the town of Apolda in Thuringia, is earmarked for completion by the end of this year. The first phase will initially create around 40 new jobs. The Doka Group is investing around US$18.28 million (€14mn) in this initial phase, as part of the ongoing development of its worldwide distribution and logistics network.

Rapid availability of formwork systems and components, and prompt, fast and flexible delivery of these items to jobsites, are said by Doka to be significant competitive aspects that are often a critical factor for customers when awarding a contract. The firm says this is why efficient logistics play such a key role in the formwork business.

“The new logistics centre for Germany that we are establishing in Apolda marks an important step for our company, especially for our customers and employees”, said Josef Kurzmann, Doka Group chairman.

The Apolda Logistics Centre will serve as a central depot for part of the Doka rental park. It aims to ensure shorter delivery times, better availability of equipment and fewer part-deliveries to jobsites. To achieve these aims, Doka says it is advantageous to be located as close to the middle of the sales territory as possible. The State of Thuringia offers just such a central location in the ‘Green Heart of Germany’, coupled with advanced transportation infrastructure. “These criteria, and the availability of skilled labour, were the deciding factors in our search for a suitable location”, said Frank Müller, managing director of Deutsche Doka.

A decision on a second development phase, with additional warehouse buildings, is likely to be taken in 2016.

The Doka Group has continued to expand its worldwide presence by establishing new branches – for example in Australia, Malaysia and Peru – and additional logistics centres. In 2012, the company invested around $169.82 million (€130mn) in its own growth. Of this total, a large share went on strengthening its logistics network.

For more information on companies in this article

Related Content

  • Doka Group expands with Australian acquisition
    July 24, 2014
    The Doka Group continues to expand its operations with the acquisition of an Australian company. Called Lubeca, this firm was the former formwork technology department of its previous owner, the Australian contractor Grocon. Doka acquired the formwork patent for the Lubeca Jumpform system, along with employees and a project portfolio from Grocon. The acquisition will strengthen Doka’s presence in Australia through its new Melbourne-based subsidiary operation, as well as in the Middle East and East Asia. Dok
  • Caterpillar stages grand opening of new parts distribution centre in Dubai
    March 6, 2013
    Caterpillar employees, executives, dealers and customers, along with local dignitaries, today celebrated the grand opening of the company’s new parts distribution centre in Dubai, United Arab Emirates (UAE). The 46,451m² Middle East Distribution Centre (MEDC) employs 130 people and will further strengthen aftermarket parts support in the East-Africa and Middle East region. The facility will also serve as a regional office for employees from other Caterpillar service groups. The MEDC follows the opening of o
  • Doka completes takeover of AT-PAC
    February 6, 2023
    Both companies initially partnered in 2020 to provide global construction site solutions.
  • Doka’s DokaTruss table and Super Climber SCP on show at Conexpo 2014
    January 6, 2017
    Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show. A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently. In the Comp