Skip to main content

Water defence

A new system for reducing the risks of road water run-off contamination is now available from HYDRO International. The firm's new Downstream Defender is said to be an advanced hydrodynamic separator and is designed to meet tough new European regulations for treatment of suspended solids and pollutants in surface water run-off.
February 17, 2012 Read time: 2 mins
HYDRO International says that its innovative new water run-off protection system can be designed to achieve site specific conditions.
A new system for reducing the risks of road water run-off contamination is now available from 1402 HYDRO International. The firm's new Downstream Defender is said to be an advanced hydrodynamic separator and is designed to meet tough new European regulations for treatment of suspended solids and pollutants in surface water run-off. The product is said to offer greater design flexibility with optimum efficiency and minimal maintenance.

The company says that this can achieve over 80% removal of grits, silts and oils in a smaller footprint than conventional gravity or swirl-type devices. The system suits applications for increased treatment of run-off from roads, car parks and developments. According to the company, conventional alternatives do not provide protection against stored solids and pollutants from being flushed out during intense storms. However HYDRO International's new product is able to prevent re-entrainment (or washout) during peak storm conditions. This product also allows a user to change outlet pipe direction as needed, without the need to construct a second manhole.

The Hydro Downstream Defender is expected to be used increasingly to treat run-off from impermeable surfaces where there is a build-up of sediments, floatables and petroleum products such as highways, car parks and industrial areas. It is said to be effective at removing and retaining sediments that carry adsorbed chemical pollutants, metals and hydrocarbons. Downstream Defender is also ideal for use as part of a treatment train solution for SUDS schemes, as an alternative to a sediment forebay, or to provide protection for a detention basin or pond. The Hydro Downstream Defender comprises a reinforced concrete chamber with internal polypropylene components and no moving parts. The unit is designed to induce a rotational flow pattern with a low headloss, achieving a long, stable flow path to maximise separation of solids, floatables and oils within a small footprint.

For more information on companies in this article

Related Content

  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
  • How to reduce environmental impact with Cummins Performance Series
    May 10, 2022
    There has been significant focus on alternative power solutions for off-road vehicles and equipment such as hybrid, full electric and hydrogen. Whilst these solutions will be suitable in the long term, it will take time for these technologies to be competitive and enable wider adopted in the construction industry.
  • Versatile tools for road reclamation
    January 25, 2023
    A notable development in the off-highway equipment sector is the development of new generation road reclamation tools
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau