Skip to main content

Volvo wins on aggregate

In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th
December 3, 2013 Read time: 4 mins
In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine.

3180 Lafarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market.

The mine is located in the heart of the Pacific Northwest rain forest, where the average annual rainfall exceeds 1.27m. In the winter months it’s even more challenging with more than 1.52m of snow falling on mountainous land. Sunshine is scarce, and mountain roads are steep, with many paths on an incline of 20 degrees or higher.

“We are dealing with a lot of steep hills,” said Mike Pratchett, president of Vertex. “We also have to deal with almost 3.2km haul cycles and rain for 10 months of the year, resulting in muddy slippery slopes. You could say we have tough working conditions to contend with almost all year round.”

Vertex not only excavates clay and till at the mine but also clears the mountainside of logs, strips off the over-burden (that in some areas can be over 30m deep), controls mine waste management and works with the provincial and local authorities on water management and environmental issues, as well as road building.

With this amount of responsibility, Vertex needs reliable and efficient machinery it can count on. Volvo Construction Equipment (359 Volvo CE) machines help to expose daily more than 3,600tonnes of the best concrete aggregate. Vertex has no equipment in its fleet without the Volvo name on it. Its current taskforce consists of a pair of Volvo EC360B excavators, five Volvo A25D articulated haulers and a Tier 4-compliant Volvo EC380D crawler excavator.

One of the first of its kind to be delivered in North America, the Volvo EC380D has set the standard with its powerful Volvo D13Tier 4i engine rated at 208kW, maximum digging reach of 11.7m, maximum digging depth of 8.1m, and a maximum operating weight of 39.39tonnes. This heavy-duty production machine can be used for quarrying, road building, truck loading, mining construction, mass excavation, utility trenching and more.

“When the machine arrived, we added a few additional accessories to it, such as the larger 60-inch digging bucket, a hydraulic thumb and, because our contract calls for log clearing, we added the falling object protective structure (FOPS) to guard the cab from falling debris,” said Patchett. “It’s a tremendous machine, plenty of power, great stability, superior lighting and a cab full of creature comforts. Even in this till and clay that has been compacted for centuries, the excavator has allowed us to improve our cycle times.”

The Vertex team is pleased with the performance of its Volvo A25D articulated haulers. “My dad started his business using Volvo machines, and I’ve been around them all my working life,” commented Patchett. “When it came time to buy my own trucks, I wouldn’t consider any other brand. Because of the efficiency of the transmission retarders and exhaust brakes, we haven’t had to replace a single brake pad.”

“We do everything that our customer asks of us,” he added. “If we don’t have the equipment or the manpower, we’ll go and get it. A satisfied customer is a happy customer, and we have a terrific working relationship with Volvo CE’s dealer in the region – Great West Equipment. We do the daily maintenance, but when it comes to larger issues, we just give them a call and they’re here.”

For more information on companies in this article

Related Content

  • Get paid faster for your work by being efficient, optimised, and careful with resources… get connected now
    September 1, 2023
    In this, the third roundtable meeting in World Highways’ series of Connected Construction discussions, Guy Woodford discusses the implications of developments in artificial intelligence (AI) and machine control with world-class experts in their field. Find out what Elwyn McLachlan, vice president of Civil Solutions at Trimble, Murray Lodge, senior vice president and general manager of Construction at Topcon Positioning Group, and Magnus Thibblin, vice president Heavy Construction at Hexagon Geosystems have to say about how you should be positioning your company for a successful future.
  • Infrastructure stays strong on the road to recovery
    July 1, 2021
    After more than a year of uncertainty, the road industry is coming back stronger than ever before thanks to new ways of working and increased investment – because building new infrastructure lays the foundation for a more resilient and economically robust world.
  • Hailing a Sennebogen 624 E taxi duty cycle crane in France
    October 3, 2018
    Speyser, a family-run company from Bas-Rhin, France, is widely known in eastern France for its expertise in special large-diameter and deep drilling operations. As a long-time user of Sennebogen equipment, the French company invested in the completely new 624 E HD duty cycle crane for work on a site south of Strasbourg. Speyser is drilling large-diameter boreholes in a gravel pit to enable commissioning of the gravel extraction systems on site, explains Christophe Sprauel managing director of Speyser. "Our
  • Volvo moves mountains in Portugal
    June 8, 2015
    Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula. The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in t