Skip to main content

Volvo moves mountains in Portugal

Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula. The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in t
June 8, 2015 Read time: 2 mins
7659 Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula.

The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in the late 1970s, which is treacherous, especially in winter.

The new project is to extend the A4 motorway from Porto from where it now stops at Amarante to Vila Real but it will go straight through the mountain and include the twin parallel tunnel Túnel do Marão running nearly 6km east to west.

It will be the largest road tunnel in Portugal and one of the largest on the peninsula. Working on the project is underground construction specialist EPOS - Empresa Portuguesa de Obras Subterrâneas - which is already behind some of the most important road and rail tunnels in Portugal, Spain and Algeria.

EPOS began work on the twin tunnels in October 2014 and plans to finish concreting and paving stages by February 2016. EPOS is still on the excavation stage and has excavated around 35% of the tunnel’s length using 22 pieces of Volvo construction equipment, of which 13 were purchased shortly before the project began.

Part of a larger 71-strong fleet, provided and serviced by independent dealer Ascendum Portugal, EPOS’s Túnel do Marão contingent includes four Volvo EW140D wheeled excavators, four L220H wheeled loaders and 14 A40G articulated haulers.
“On a project like this, where work continues around the clock, 30 days a month, 100% machine availability is one of our biggest requirements. We cannot risk delay due to unscheduled downtime,” said Dias de Carvalho, EPOS’s general manager of 20 years.

“I have relied on Volvo Construction Equipment for decades and the quality of the machines, their ease of maintenance and the service provided by Ascendum Portugal has never let me down.”

Related Content

  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium. The concession for the tunnel, which, at 5.6km, will be Portugal’s longest road tunnel, is now under the control of the state road agency Estradas de Portugal. Another investment of €150 million (US$ 202.91 million) is required to complete the major infrastructure works, earmarked for completio
  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium.
  • Portuguese tunnel and link road contracts awarded
    July 14, 2014
    A consortium of contractors comprising Teixeira Duarte and EPOS will handle the construction of Portugal’s Marao Tunnel. The consortium won the tender with a bid of €88.1 million. The tunnel will measure 5.9km long when complete. Separate deals for other sections of the route have also been awarded. The section at Amarante will be handled by Opway, which offered a €29.5 million bid. A consortium comprising contractors Ferrovial and Lena will handle the Vila real section, having offered a bid of €28.8 millio
  • Portugal and Spain to revamp a bridge over the border river Guadiana
    September 22, 2015
    The Portuguese road operator Infraestruturas de Portugal is to tender a €13 million contract for refurbishment of the international bridge over the Guadiana river, connecting Vila Real de Santo Antonio in Portugal and Ayamonte in Spain. The work will take 18 months and the cost will be shared by both countries, a report in Diário Económico said. Around 80% of the river is in Portugal. The river flows east to west through Spain, then south through Portugal, then forming the Spanish-Portuguese border