Skip to main content

Separators boost waste re-use

A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste. The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon. Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and pa
June 13, 2012 Read time: 2 mins
A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste.

The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon.

Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and paper from the same source.

More than 4,000tonnes of construction, demolition and skip waste arrives on site every week and is converted into a wide variety of products including fuel, ferrous and non-ferrous metals and plastics for onward processing, and a range of crushed concrete and aggregate products for reintroduction to the UK construction industry.

Weighing just nine tonnes, the Max X Tract uses a one-pass system to process up to 150tonnes/hour, depending upon feed material.

At the 777 Recycling Centre, the first Max X Tract unit receives material from a trommel via an elevated conveyor. It segregates the light and the heavy materials: the light being destined for RDF applications; with the heavier materials moving on for further processing to the other Max X Tract. Here the final clean-up occurs where wood gets separated from the aggregate, ensuring two high quality end products. The initial exposure of material to a Max X Tract effectively removes any remaining metals from the waste stream.

Related Content

  • Concrete solution for Georgia's Silk Road section
    February 20, 2012
    The E60 highway project forms a key route of strategic importance for both Europe and Asia. This long road from the port of Brest in France, crosses Germany, Austria, Hungary, Romania, Switzerland, Georgia, Azerbaijan, Turkmenistan, Tajikistan, Uzbekistan, and ends at Irkeshtam in Kyrgzstan.
  • New low emission, versatile asphalt plant from Marini
    February 11, 2013
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
  • Nigerian asphalt producer increasing capacity with Sandvik plant
    June 30, 2014
    In Nigeria a major asphalt producer is increasing production capacity to cope with growing demand for its materials Nigeria is developing its road and highway network, which has triggered greater demand for quality aggregates and asphalt for construction. Producer Asphalt Unity Construction is now meeting this demand with its purchase of new mobile equipment from Sandvik Construction.
  • Chinese plant order for Lintec
    October 6, 2021
    Lintec-Linnhoff has supplied a major Chinese contractor with an asphalt batching plant to meet high output requirements. The contractor required a plant able to deliver over 3000tonnes of asphalt/day to keep pace with strong demand in the area