Skip to main content

Concrete solution for Georgia's Silk Road section

The E60 highway project forms a key route of strategic importance for both Europe and Asia. This long road from the port of Brest in France, crosses Germany, Austria, Hungary, Romania, Switzerland, Georgia, Azerbaijan, Turkmenistan, Tajikistan, Uzbekistan, and ends at Irkeshtam in Kyrgzstan.
February 20, 2012 Read time: 4 mins
The Israeli contractor achieved high productivity with its GOMACO machine, paving a high tolerance finish
The E60 highway project forms a key route of strategic importance for both Europe and Asia. This long road from the port of Brest in France, crosses Germany, Austria, Hungary, Romania, Switzerland, Georgia, Azerbaijan, Turkmenistan, Tajikistan, Uzbekistan, and ends at Irkeshtam in Kyrgzstan. The E60 follows the ancient route of the Silk Road, a 6,437km long trade route used for transporting goods, such as silk, from China to different parts of the world. This route has an impressive history stretching back over 2,000 years as a trade route, and is still important today.

Georgia is investing heavily in its highway structure and this includes rebuilding the E60 across the country. Israeli firm Ashtrom International was responsible for rebuilding a 25km section of the old highway, the stretch connecting Igoeti to Sveneti. This has been rebuilt as a new, four-lane highway and also introduced modern concrete slipforming techniques to the country. The use of concrete for road construction offers a long-lasting solution, particularly in countries such as Georgia where winter conditions can be tough.

Ashtrom International purchased a new 218 Gomaco GP-4000 slipform paver with an independent dowel bar inserter (IDBI) and a T/C-600 texture/cure machine to slipform the new east/west portion of roadway. The paving season is short in Georgia, due to winter weather, so deadlines were tight to get the equipment manufactured and shipped from GOMACO's plant at Ida Grove in the US state of Iowa. The fastest method of delivery was by air, so Ashtrom hired a massive Russian Antonov cargo plane to transport its new equipment.

Ruslan International, a new partnership between Antonov Airlines and Volga-Dnepr Airlines, provided the Antonov 124-100 aircraft used to transport the GP-4000 to Georgia. The aircraft flew from Lincoln in Nebraska, to Gander in Newfoundland, before heading across the Atlantic to Prestwick in Scotland, Bergas in Bulgaria and finally landing in Georgia. The GP-4000's shipping dimensions are 15x3x3.7m and it weighs around 42tonnes, while the special 5000 series mold with auger/strike-off weighs around 15.8tonnes and the aircraft also had to carry the IDBI as well as various other paver components.

The GP-4000 slipformed the new road to be 11.5m wide by 280mm thick. The pavement profile consisted of a 1m wide outside shoulder, two 3.75m wide driving lanes, and a 3m wide inside shoulder. The transverse joint in the pavement was every 5m where the IDBI implanted 28 dowel bars across the width of the new road. The configuration of the lanes dictated different spacings for insertion of the 25mm diameter by 0.5m long bars. The inside lane is designated as the high-traffic lane, so extra bars were built into its design to handle the heavier load. All bars were placed 140mm into the centre of the slab's thickness.

Concrete for the project was provided by Ashtrom's on-site batch plant, which was set up in the centre of the project. In all 25 dump trucks carrying 7m3 loads were needed to keep the GP-4000 supplied with concrete. Slump averaged between 30-40mm, a feature that was critical to the job.

Paving production averaged between 450-500m/day, although the crew did achieve 765m on one 10.5 hour day. In General, production was limited by subgrade preparation as Ashtrom's crew could pave faster than the subgrade crew could place and level the crushed stone base.

The paver did have to be moved around a lot on the project and the contractor said that the GP-4000's versatility came in useful. The machine would be used to pave one day, transported to the next section the next day and then be used for paving again the following day.

A T/C-600 texture-cure machine followed the GP-4000 paver. It applied a carpet drag finish and sprayed a curing compound on the new roadway and this performed well to the tolerances required.

For more information on companies in this article

Related Content

  • New concrete surface for Arizona freeway
    November 15, 2013
    In Tucson, Arizona, contractor McNeil brothers is using a two-track GOMACO concrete slipformer on a 3.2km stretch of highway. This project is for the Arizona Department of Transportation (ADOT) and involves widening Interstate 10 to four lanes of traffic in each direction between Ruthrauff Road and Prince Road in Tucson. This new stretch was needed to better handle increasing traffic demands in the city and includes rebuilt entrance and exit ramps to improve access to the city.
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • Gomaco smooth the way for new NY State concrete highway
    April 2, 2014
    When New York State Thruway wanted to experiment with unbonded concrete overlays, they chose an 8km, four-lane section of Interstate 90 near Hamburg as their test section. Surianello General Concrete, based in Buffalo, New York, won the bid to pave the 22.9cm thick concrete overlay. The age and the design of the original roadway created a major paving challenge. It was built in the 1950s and didn’t conform to current geometry requirements for superhighways. “They built it with a standard crown sectio