Skip to main content

Separators boost waste re-use

A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste. The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon. Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and pa
June 13, 2012 Read time: 2 mins
A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste.

The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon.

Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and paper from the same source.

More than 4,000tonnes of construction, demolition and skip waste arrives on site every week and is converted into a wide variety of products including fuel, ferrous and non-ferrous metals and plastics for onward processing, and a range of crushed concrete and aggregate products for reintroduction to the UK construction industry.

Weighing just nine tonnes, the Max X Tract uses a one-pass system to process up to 150tonnes/hour, depending upon feed material.

At the 777 Recycling Centre, the first Max X Tract unit receives material from a trommel via an elevated conveyor. It segregates the light and the heavy materials: the light being destined for RDF applications; with the heavier materials moving on for further processing to the other Max X Tract. Here the final clean-up occurs where wood gets separated from the aggregate, ensuring two high quality end products. The initial exposure of material to a Max X Tract effectively removes any remaining metals from the waste stream.

Related Content

  • Bavarian workload for a Sennebogen 835 E-series material handler
    May 18, 2018
    Sand and gravel extraction in the Main valley has always been a mainstay of family-owned LZR - Lenz Ziegler Reifenscheid - in Kitzingen, Bavaria. Every day, around 800tonnes arrive at the gravel plant via the Main River. The company not only supplies ready-mixed concrete, but is active in demolition and waste disposal. Since mid-2017, a Sennebogen 835 E-series material handler has been operating at the Kitzingen site. Equipped for an 18m reach and with a 2000-l double-shell grab, operator Uwe Marx dredges
  • The AI-based SBM REMAX 600 mobile impact crusher
    October 26, 2022
    SBM Mineral Processing (SBM) has developed the REMAX 600 track-mobile impact crusher as a ‘technological platform’ for an AI (artificial intelligence)-based, fully automatic production monitoring and control system.
  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in
  • Hitachi EX1900-6 increases productivity at Swinden, UK quarry
    January 26, 2017
    Materials supplier Tarmac has invested in a Hitachi EX1900-6 ultra-large excavator for its Swinden Quarry in North Yorkshire, England. The EX1900-6 is used to load up to 1,200 tonnes of carboniferous limestone per hour directly into a 200tonne mobile crusher. A field conveyor takes the material to a secondary crusher at an average rate of 1,000tonnes/hour. The Hitachi model was supplied with a longer boom and arm, and a smaller 8m³ bucket, customary on a machine of this size. “This is because it needs