Skip to main content

Marini mobile asphalt plant XPRESS 2500 P at Reykjavik Airport

Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction. The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind. However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, Colas is resurfacing the main runway and constructing a third strip and contracting other road works. The highway network i
May 17, 2017 Read time: 3 mins
Colas operates Marini’s XPRSS 2500 P for runway duty
Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction.


The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind.

However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, 184 Colas is resurfacing the main runway and constructing a third strip and contracting other road works.

The highway network is shaped around the natural features of a difficult and constantly changing – sometimes abruptly - environment. Around 60% of the road system is not asphalted while 35% has a single-surface treatment. Only 5% of the road network consists of traditional hot asphalt.

In 1987, Colas, a global road building company took the decision at its Denmark offices to establish an operational centre in Iceland. Now, of the 350,000tonnes of asphalt produced on the island annually, around 250,000tonnes are provided by Colas.

In the second half of 2015, Colas Denmark, including the Icelandic operations, conducted a technical-commercial market survey, aimed at pinpointing a new plant whose first task would be to re-qualify and expand Reykjavik’s airport. The work was to act as a benchmark for the company’s work on other building and maintenance projects on the island.

Fundamental for future asphalt plant on the island was good mobility on wheels, for quick and easy transfer but over rough terrain. The plant also had to have rapid installation to permit quick, low-cost relocation without the need of often unavailable heavy-lifting equipment.

Capacity of the plant had to be more than 200tonnes/hour to enable production in a short period of time. Also required was sufficient storage to permit uninterrupted production.

Finally, resistance, quality and reliability were important for an asphalt plant to ensure continuous production. Plant servicing in Iceland, both from the point of view of technical support and the supply of necessary spare parts, can be a problem.

The choice of a 273 Marini mobile plant, a 2500 P model from the XPRESS range, was the choice, according to Colas. It could produce 200tonnes/hour with 5% moisture in virgin aggregates. Also, all components were on individually wheel-mounted units with its own braking system to meet road circulation standards. Remaining components are housed and transported in a specific container.

The plant is self-erecting by way of a hydraulic system that lifts the main trailer into its working position. A small electric winch fitted onto the main trailer positions the screens and elevator into their final work stations. Structural integrity is assured through such initiatives as Marini Endurance, a high-wearing elevator with resistant REX chain.

In May 2016 Marini finally moved the machine out of the company workshop in Alfonsine, north-east Italy, and onto a ship at nearby Ravenna for its journey to Iceland. After a four-week sea journey and two weeks of testing, the unit was ready for work.

The first job awaiting the new XPRESS 2500 P has been the resurfacing of the new runway at Reykjavik airport, around 50km from the capital city and an important European tourist flight centre.

For more information on companies in this article

Related Content

  • Improved Lanzhou airport road link in China
    December 10, 2015
    An upgraded road link will reduce travel time to and from Lanzhou Zhongchuan Airport in China Work on the expressway connecting Lanzhou Zhongchuan Airport to Lanzhou city centre is now underway. An important role in the resurfacing work is being played by the use of materials supplied by Shell Bitumen. The facility is the main airport for Gansu Province and it is of major economic importance to the region. The expressway runs some 70km from Lanzhou Zhongchuan Airport to the centre of Lanzhou. Work on the
  • Excavator delivers high productivity
    February 16, 2012
    A Case CX700B excavator is delivering high productivity for an extraction application in Germany's volcanic Eifel region.
  • Born to roam, the Bison concrete batch plant from Simem
    April 14, 2016
    Like the wild bison of North America, this Bison from Italian manufacturer Simem can roam from place to place because it is “hyper mobile”. And when it is not roaming, it can produce up to 500 tonnes an hour, making it suitable for large civil works such as dams, airports and tunnel work.
  • Recycling from the wings to centre stage
    May 20, 2014
    Driven by the price of virgin aggregates and strong environmental concerns, the recycling of reclaimed asphalt already is and will increasingly be a hot topic within the asphalt plants’ and associated equipment manufacturing sector, says Kathrin Richter, marketing manager for Ammann’s Asphalt Division “Until a few years ago, the question was: How much reclaimed asphalt can one add to the recipe mix? Today, the question is more likely to be: How much fresh material should I add to the reclaimed asphalt? Ove