High production at high altitude for Liebherr’s Compactmix 1.0

A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
May 20, 2019 Read time: 2 mins
High performance: Liebherr Compactmix 1.0 produces concrete at 2,340m for one of Europe’s largest aerial cableways
A 718 Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete.


The project was a challenge both in terms of logistics and on-site operation.

The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps).

From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger Glacier. There will also be a 10-seat aerial gondola cableway to Männlichen.

In addition, the new Rothenegg station will give the V-cableway a direct connection to public transport.

The project managers at ARGE V-Bahn Oberland were looking for a mixing plant that could be transported by cable car. They decided upon Liebherr’s Compactmix 1.0 for the major V-cableway project in Grindelwald. The Compactmix 1.0 A-R/ RIM-M has a compact design and can be pre-assembled into transport-friendly modules.

Since the aerial cableway was not ready for operation by the specified assembly date, the plant components were transported to the construction site by two axle-truck and dump truck. The plant was then built on the Eiger Glacier at an altitude of 2,340m.

For optimum mixing results, the plant is equipped with a ring-pan mixer with agitator system. For concrete production at low temperatures the plant is also fitted with winterproof housing. Concrete production is up to 60m³ per hour.

The aggregates and cement are also delivered to the plant by aerial cableway and fed directly from the cable car into the series silo. Total production volume is expected to be worth nearly €418 million. Opening is planned for the 2020/2021 winter season.

For more information on companies in this article

Related Content

  • Asphalt plant retrofit with Benninghoven
    March 30, 2022
    An existing asphalt mixing plant in Braunfels, Germany has benefited from a retrofit solution to boost its performance. Asphalt plant manufacturer Benninghoven was able to supply a new mixing tower and drying section to upgrade the performance of the facility.
  • Trends in asphalt plant innovations
    August 27, 2019
    Key trends exist in the asphalt plant market, with manufacturers focussing on meeting customer needs and industry trends
  • High profile for Blastcrete’s low-profile Mine Mate
    April 4, 2018
    If ready-mix concrete is not an option for underground sealing, stabilisation and grouting, then Blastcrete Equipment’s Mine Mate will step up. The low-profile Mine Mate mixes and pumps concrete material for shotcrete applications. It features Blastcrete’s X-10 ultra high-pressure swing tube pump for the wet-mix shotcrete process. In contrast to the dry shotcrete – gunite - the wet shotcrete process minimises dust and improves visibility making it much safer, particularly for underground use. Featuring a co
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 26, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance.