High production at high altitude for Liebherr’s Compactmix 1.0

A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
May 20, 2019 Read time: 2 mins
High performance: Liebherr Compactmix 1.0 produces concrete at 2,340m for one of Europe’s largest aerial cableways
A 718 Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete.


The project was a challenge both in terms of logistics and on-site operation.

The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps).

From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger Glacier. There will also be a 10-seat aerial gondola cableway to Männlichen.

In addition, the new Rothenegg station will give the V-cableway a direct connection to public transport.

The project managers at ARGE V-Bahn Oberland were looking for a mixing plant that could be transported by cable car. They decided upon Liebherr’s Compactmix 1.0 for the major V-cableway project in Grindelwald. The Compactmix 1.0 A-R/ RIM-M has a compact design and can be pre-assembled into transport-friendly modules.

Since the aerial cableway was not ready for operation by the specified assembly date, the plant components were transported to the construction site by two axle-truck and dump truck. The plant was then built on the Eiger Glacier at an altitude of 2,340m.

For optimum mixing results, the plant is equipped with a ring-pan mixer with agitator system. For concrete production at low temperatures the plant is also fitted with winterproof housing. Concrete production is up to 60m³ per hour.

The aggregates and cement are also delivered to the plant by aerial cableway and fed directly from the cable car into the series silo. Total production volume is expected to be worth nearly €418 million. Opening is planned for the 2020/2021 winter season.

For more information on companies in this article

Related Content

  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A
  • Southeast Asia’s cutting-edge asphalt production
    April 1, 2014
    An eye-catching state-of-the-art asphalt plant is making a big impact in South East Asia, while other new and proven asphalt plant technology remains in demand in Europe and other continents. Guy Woodford reports Marini China has ventured out of its traditional Chinese market to deliver to a Singaporean customer what is claimed to be Asia’s largest asphalt plant. An impressive 45m tall and capable of producing 360tonnes/hour, the plant model was in response to Ley Choon Group’s request for a new plant ahead
  • KwaMhlanga Group buys Rapidmix concrete plant for South African roadwork
    May 14, 2018
    Rapid International of County Armagh, Northern Ireland, has supplied KwaMhlanga Group (Gauteng province, South Africa) with a new Rapidmix 400CW mobile continuous concrete mixing plant to produce road sub-base in South Africa. KwaMhlanga Group bought the Rapidmix plant for road rehabilitation via base layer stabilisation and road construction using sub-base layer stabilisation. The group’s previous production process resulted in inaccurate blending of emulsions and cement into aggregates and lower than des
  • ADM’s EX Series asphalt plants on show at CONEXPO-CON/AGG 2014
    January 6, 2017
    Claimed by Asphalt Drum Mixers (ADM) to offer high efficiency and a compact design for contractors with low to medium production needs, the U.S. firm will be showcasing its new EX Series asphalt plants with single-drum counterflow technology at CONEXPO-CON/AGG 2014. The EX Series asphalt plants are said to produce between just over 90 to 385.5tonnes/hour at a very low cost per tonne.