Skip to main content

High production at high altitude for Liebherr’s Compactmix 1.0

A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
May 20, 2019 Read time: 2 mins
High performance: Liebherr Compactmix 1.0 produces concrete at 2,340m for one of Europe’s largest aerial cableways
A 718 Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete.


The project was a challenge both in terms of logistics and on-site operation.

The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps).

From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger Glacier. There will also be a 10-seat aerial gondola cableway to Männlichen.

In addition, the new Rothenegg station will give the V-cableway a direct connection to public transport.

The project managers at ARGE V-Bahn Oberland were looking for a mixing plant that could be transported by cable car. They decided upon Liebherr’s Compactmix 1.0 for the major V-cableway project in Grindelwald. The Compactmix 1.0 A-R/ RIM-M has a compact design and can be pre-assembled into transport-friendly modules.

Since the aerial cableway was not ready for operation by the specified assembly date, the plant components were transported to the construction site by two axle-truck and dump truck. The plant was then built on the Eiger Glacier at an altitude of 2,340m.

For optimum mixing results, the plant is equipped with a ring-pan mixer with agitator system. For concrete production at low temperatures the plant is also fitted with winterproof housing. Concrete production is up to 60m³ per hour.

The aggregates and cement are also delivered to the plant by aerial cableway and fed directly from the cable car into the series silo. Total production volume is expected to be worth nearly €418 million. Opening is planned for the 2020/2021 winter season.

For more information on companies in this article

Related Content

  • Liebherr’s new mixing plant generation
    October 11, 2022
    Liebherr is introducing a new mixing plant generation, with modular design being a key feature. The new generation plants will be available in Germany, Austria and Switzerland from 2023, and will then be made available for world markets.
  • Concrete plants: flexibility and efficiency
    March 17, 2016
    Concrete mixing plants are becoming more flexible and innovative to ensure they meet increasingly stringent construction schedules. Increasing demands are put on contractors to cut down the transportation of material to construction sites in the name of efficiency and the environment. For that reason concrete mixing plants are increasingly flexible in their transportation to sites, their set up times and their output. Ammann Elba, the company created when German-based Elba was acquired by Ammann in 20
  • Strong interest for construction equipment show
    February 21, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.
  • Strong interest for construction equipment show
    May 2, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.