Skip to main content

High production at high altitude for Liebherr’s Compactmix 1.0

A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
May 20, 2019 Read time: 2 mins
High performance: Liebherr Compactmix 1.0 produces concrete at 2,340m for one of Europe’s largest aerial cableways
A 718 Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete.


The project was a challenge both in terms of logistics and on-site operation.

The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps).

From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger Glacier. There will also be a 10-seat aerial gondola cableway to Männlichen.

In addition, the new Rothenegg station will give the V-cableway a direct connection to public transport.

The project managers at ARGE V-Bahn Oberland were looking for a mixing plant that could be transported by cable car. They decided upon Liebherr’s Compactmix 1.0 for the major V-cableway project in Grindelwald. The Compactmix 1.0 A-R/ RIM-M has a compact design and can be pre-assembled into transport-friendly modules.

Since the aerial cableway was not ready for operation by the specified assembly date, the plant components were transported to the construction site by two axle-truck and dump truck. The plant was then built on the Eiger Glacier at an altitude of 2,340m.

For optimum mixing results, the plant is equipped with a ring-pan mixer with agitator system. For concrete production at low temperatures the plant is also fitted with winterproof housing. Concrete production is up to 60m³ per hour.

The aggregates and cement are also delivered to the plant by aerial cableway and fed directly from the cable car into the series silo. Total production volume is expected to be worth nearly €418 million. Opening is planned for the 2020/2021 winter season.

For more information on companies in this article

Related Content

  • Concrete plant innovations coming to market
    December 12, 2022
    An array of advanced technologies are now coming to market for the concrete plant segment. Manufacturers are developing new systems that offer rewards in output quality and productivity, while also benefiting from sophisticated systems that allow gains in material logistics
  • Concrete plant efficiency with new machines
    August 14, 2019
    New technology for concrete production will help boost efficiency New advances in concrete plant technology will help boost materials quality for users. The latest machines are more versatile and more productive than previous generation equipment. Ease of transport and fast assembly/disassembly and commissioning are other important factors for the latest plants. Research and development is an important issue for all manufacturers in the segment. With Liebherr for example having two new laboratory mixe
  • High precision concrete production
    February 24, 2012
    Innovative plants are coming to the market to produce various types of concrete including new mixes as Patrick Smith reports
  • Efficient concrete production in Germany
    January 11, 2019
    A German concrete producer, Thomas Beton, is boosting its operating efficiency by using the latest plants. The firm is now producing high-quality ready-mix for a range of projects in North Germany. Thomas Beton is strengthening its local presence and produces concrete at 26 facilities across the German states of Schleswig-Holstein, Hamburg, Bremen and Lower Saxony. Producing materials closer to operating sites helps lower transportation distances and reduce logistics costs for its clients. When the firm w