Skip to main content

CDE Global improves its ProGrade screen design

Materials washing specialists CDE Global has announced the introduction of several screens in the ProGrade range which it says are lighter but stronger and so require less power to operate. The bolted screens also include no welds and are galvanised as standard, all of which serves to maximise plant life, maximise plant availability and minimise maintenance time. The patent pending CDE U-Span cross members are modular in design and have increased space between screen decks, allowing for quick and easy acces
March 10, 2015 Read time: 1 min
Materials washing specialists 3168 CDE Global has announced the introduction of several screens in the ProGrade range which it says are lighter but stronger and so require less power to operate.

The bolted screens also include no welds and are galvanised as standard, all of which serves to maximise plant life, maximise plant availability and minimise maintenance time.

The patent pending CDE U-Span cross members are modular in design and have increased space between screen decks, allowing for quick and easy access to replace screen media.

The new screen design system is now available on the 2-deck ProGrade P2-75 and P2-108, as well as the 3-deck P3-75 and, in several months, the P3-108.

For more information on companies in this article

Related Content

  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    January 6, 2017
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Improved roadmarkings will boost roadway safety for users
    February 19, 2013
    An Innovative road marking system helping to boost public transport in a major South American city, and road marking analytic technology robust enough to withstand damage in heavy rain are among products examined by Guy Woodford . DEGAROUTE Methacylate (MMA) cold plastic area markings from Evonik Industries are being used as part of efforts to improve the public transport system in Santiago, Chile. By adding red pigment to the DEGAROUTE binder, distinctive and long-lasting red-coloured bus lanes are being c